Similar Projects
2022 Street Paving and Repair
Infrastructure
Bidding
$300,000 est. value
Portage, IN

Hot Mastic Asphalt (HMA) for Dickinson Road and Rail Road
Post-Bid
Chesterton, IN 46304

Eisenhower Avenue - Valparaiso 2021 Community Crossings Road Improvements
Post-Bid
Valparaiso, IN 46383

Asphalt Resurface, Intersection Improvement and Arch Rehab
Results

Asphalt Resurface
Results
IN

Parking Lot Newspaper Ad - Pave Parking Lot
Post-Bid
La Porte, Valparaiso, IN 46383

2021 Street Repair and Resurfacing
Results
Kouts, IN

Thomas Jefferson Middle School Soccer Parking Lot Asphalt Paving
Infrastructure
Post-Bid
Valparaiso, IN 46383

Robbins Road Extension at Willowcreek Road
Results
Portage, IN 46368

Bonner Senior Center Improvements
Infrastructure
Post-Bid
Portage, IN

2021 Street Paving and Repair
Results
Portage, IN 46368

2021-1 CCMG - Community Crossings Improvements
Infrastructure
Post-Bid
Valparaiso, IN

Porter County Highway Department - Roadway Projects A Through F
Results
IN

Hot Mastic Asphalt (HMA)
Infrastructure
Post-Bid
Chesterton, IN

2020 Community Crossings Road Improvements Call 2
Results
Hebron, IN

Last Updated 05/17/2022 02:31 PM
Project Title

2021-2 Burns Harbor CCMG

Physical Address View project details and contacts
City, State (County) Burns Harbor, IN 46304   (Porter County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $900,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of the project includes asphalt milling, HMA resurface and full depth replacement, aggregate roadway shoulder, pavement markings, curb and gutter, adjust/replace drainage castings, subgrade treatment, topsoil and seeding, and ADA curb ramps. The project will be constructed in ten (10) separate contract divisions, defined as follows: 1.Verplank Drive from US Highway 20 to Babcock Road 2.Babcock Road from Verplank Drive to Old Porter Road 3.Allegius Drive from US Highway 12 to 900 feet East 4.Shadyside Drive from Hickory Lane to US Highway 12 5.Marilyn Road from Salt Creek Road to Carol Street 6.Whitney Street from Marilyn Road to South Boo Road 7.Tanya Street from Marilyn Road to South Boo Road 8.Burns Boulevard from US Highway 20 to South Boo Road 9.Village Square South from Burns Boulevard to Harbor Way 10.Village Square North from Burns Boulevard to Harbor Way The award of any Contract may be made on the Base Bid of all Divisions only, Base Bid of any combination of Divisions, or any combination of the Base Bids of any individual Divisions and selected Alternate Bids.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents