Similar Projects
Asbury Theological Seminary Future Master Plan
New Construction - 750,000 SF
Conception
$10,000,000 CJ est. value
Orlando, FL 32825

Silverleaf Development Master Plan
New Construction
Conception
Winter Garden, FL 34787

Flamingo Crossings - Master Plan
New Construction - 150,000 SF
Design
Winter Garden, FL 32708

Vive on Eola
New Construction - 77,200 SF
Design
Less than $500,000 CJ est. value
Orlando, FL

RFQ Design - 675-103 - Create Cardiovascular Center Design Orlando VAMC
Demolition, Renovation, Infrastructure - 19,000 SF
Bidding
$20,000,000 CJ est. value
Orlando, FL 32827

Jet Blue Tenant Improvement South Terminal C - Airside and Landside
Build-Out - 33,200 SF
Post-Bid
Orlando, FL 32827

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Purchase and Development of Wymore Road/Hungerford Property
Results
Orlando, FL 32809

SR 417 Widening from John Young Parkway to Landstar Boulevard
Results
Less than $116,845,417 est. value
Orlando, FL 32824

HostDime Data Center and Headquarters
New Construction - 95,000 SF
Construction
$25,000,000 est. value
Winter Park, FL 32789

Former AT&T Building
New Construction, Renovation - 116,650 SF
Construction
$7,363,378 est. value
Orlando, FL 32801

Gem Groves
New Construction, Infrastructure
Pending Verification
$65,000,000 CJ est. value
Winter Garden, FL 34787

Gem Groves
New Construction, Infrastructure
Pending Verification
$65,000,000 CJ est. value
Winter Garden, FL 34787

Florida Institute of Certified Public Accountants Headquarters
New Construction
Conception
Orlando, FL 32801

Bainbridge Universal Sandlake Apartments
New Construction - 13,700 SF
Design
$100,000,000 est. value
Orlando, FL 32819

Last Updated 08/09/2022 01:32 PM
Project Title

Britt Business Center

Physical Address View project details and contacts
City, State (County) Winter Garden, FL 34787   (Orange County)
Category(s) Commercial, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Office, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located at 530, 550, 570, 590, 610 and 630 East Crown Point Road. Scope details have not been released. As of August 9, 2022 the project is in planning stage and seeking rezoning approval from the City of Winter Garden Development Review Committee. A meeting was held July 20, 2022 and plan revisions are underway. Information regarding the architect, general contractor and method of selection has not been disclosed. The construction timeline has not been determined, but is not expected to begin before the spring of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

1 Story Above Grade. 1 Story Above Grade.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents