Similar Projects
Golden Valley High School Exterior Painting
Alteration
Bidding
Merced, CA 95341

East Campus Educational Center Exterior Painting
Alteration
Bidding
Merced, CA 95340

On-Call Hazardous Waste Transportation Services
Term Contract
Post-Bid
$249,000 est. value
Sacramento, CA

Homeless Encampment Clean-Up Services
Alteration
Post-Bid
Santa Clara, CA

R10 Emergency and Rapid Response Services (ERRS)
Results

R10 Emergency and Rapid Response Services (ERRS)
Results

Hazardous Waste Removal
Term Contract, Infrastructure
Bidding
Sacramento, CA

F108--Radioactive Waste Removal Service Gla
Term Contract
Post-Bid
Los Angeles, CA 90073

Hazardous Waste Disposal Services for the NMFS Santa Cruz Lab
Term Contract
Results
Santa Cruz, CA 95060

Sludge Removal and Disposal at Yosemite NP
Term Contract
Bidding
El Portal, Yosemite National Park, CA 95318

S205--Solid Waste Management for VA Northern CAL HCS Solid Waste & Recycle Collection and Disposal Services
Term Contract
Post-Bid
Mather, CA

F--Lead Dust Cleaning Building 201 Fort Mason at GOGA
Term Contract
Results
San Francisco, CA 94158

Liberal Arts Phase 1 Upgrade
Alteration
Bidding
$400,000 to $600,000 est. value
Pleasant Hill, CA 94523

Unsheltered Resident Encampment Hazardous Waste Cleanup and Disposal Services
Term Contract
Post-Bid

Hazardous Waste Disposal Services
Infrastructure
Results

Reported 02/25/2022 12:00 AM
Project Title

2022 Plant Coating Project

Physical Address View project details and contacts
City, State (County) Truckee, CA   (Nevada County)
Category(s) Environmental, Single Trades
Sub-Category(s) Hazardous Waste Disposal, Painting
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of facility break down, surface preparation and coating of rake arm mechanism, steel supports, miscellaneous steel, and piping for Stripper Basin No. 57 and Secondary Clarifier No. 14, and as shown and specified. Work also includes facility reconstruction following coating work the handling, containment, testing, and disposal of hazardous and non-hazardous materials and wastes in connection with the surface preparation and coating work.

Details

Division 02 - Existing Conditions, Hazardous Material Assessment, Site Remediation, Contaminated Site Material Removal, Asbestos Remediation, Asbestos Abatement, Removal and Disposal of Asbestos Containing Materials.
Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents