Similar Projects
PTTGC America Ethane Cracker Plant
New Construction, Infrastructure
Design
$7,500,000,000 CJ est. value
Shadyside, OH 43947

PTTGC America Ethane Cracker Plant
New Construction, Infrastructure
Design
$7,500,000,000 CJ est. value
Shadyside, OH 43947

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

SR 134 - Culvert Replacement
Infrastructure
Bidding
$641,000 CJ est. value
Lynchburg, OH 45142

RFQ Design - New Industrial Trades Center - Belmont Technical Center
New Construction, Infrastructure
Post-Bid
$942,282 CJ est. value
Saint Clairsville, OH 43950

Dust Control
Infrastructure
Post-Bid
Alledonia, OH

Chip Seal-BEL-SR 147-00.00
Infrastructure
Results
OH

Four Lane Resurfacing-BEL-SR 7-17.70
Infrastructure
Results
OH

SR 7 - Bridge Preservation
Demolition, New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Bellaire, OH 43906

New Ada Entrance
New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Bridgeport, OH 43912

Old Winding Hill Road
Infrastructure
Post-Bid
$400,000 est. value
Bellaire, OH 43906

2021 Asphalt Resurfacing Program
Infrastructure
Results
Bellaire, OH 43906

Bikeways
Infrastructure
Design
$1,950,000 CJ est. value
Barnesville, OH 43713

Paving of Crabapple Road, Township Road 103
Infrastructure
Bidding
$365,000 CJ est. value
Alledonia, OH 43902

Belmont County TR-219 MP 0.32 Slide Repair
Infrastructure
Post-Bid
$200,000 CJ est. value
Colerain Township, OH 43950

Last Updated 03/02/2023 11:13 AM
Project Title

2023 Pultney Township Paving Project

Physical Address View project details and contacts
City, State (County) Bellaire, OH 43906   (Belmont County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Trustees reserve the right to waive any informalities or to reject any or all bids. Bidder must be prequalified with the Ohio Department of Transportation for the types of work associated with the Pultney Township 2023 Paving Project in the amount at least equal to the bid at the time of the bid. Bidder also must furnish with the bidy a copy of current Ohio Department of Transportation Prequalification proving such. The bidder is disqualified if failure to do so. Township roads to be paved: Jeff Lane T1563 1200x16 +/- Sheryl Ave T1622 1300x16 +/- Dana Ave T1530 275x16 +/- Old Winding Hill T224 850x16 +/- The four roads shall be paid as one project. Bids will include all labor, materials, and equipment. The project roads are located off or near Co Rd 44 (Winding Hill Rd.), 1 Mile south of SR 147 (West 23rd St.) The project will consist of at least a tack coat, 2 base coat with 1 1/2 top-coat, rolled in place. Paving should include: Clean road and prepare for paving. Notch in at the start and stop points. Seal edges at the start and stop points. Milling shall be done at existing concrete driveways that adjoin said roads. Jeff Lane will require milling of approximately 4 inches. Equipment and Labor are to be furnished by the Bidder to complete the job. Bidder must produce a copy of Affidavit of Insurance and/or Bond of Liability Mail to Pultney Township Trustees, Marla Krupnik, Fiscal Officer, PO Box 225, Bellaire, OH 43906

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents