Similar Projects
Construct New Parking Lot
Alteration
Design
$500,000 to $1,000,000 est. value
Dublin, CA 94568

FY 2022 Sidewalk Repair Project
Infrastructure
Bidding
$2,250,000 est. value
Berkeley, CA

Underground Utility District 38
Term Contract, Alteration
Bidding
Alameda, CA

Meadowlark Trail
Infrastructure
Post-Bid
$50,000 est. value
Pleasanton, CA

Rapid Corridors San Pablo Avenue Project
Infrastructure
Post-Bid
Oakland, CA 94622

Accessible Improvement Program - Phase 1
Infrastructure
Results
$1,000,000 to $5,000,000 est. value
Oakland, CA

Fruitvale Alive Gap Closure
Infrastructure
Results
$10,908,219 est. value
Oakland, CA 94622

Foothill High School Staff Parking Lot and Ball Field Fence
Infrastructure, Alteration
Bidding
Pleasanton, CA 94588

Trip Hazard Removal of Raised Sidewalk
Infrastructure
Post-Bid
Hayward, CA

Install Accessible Pedestrian Signal and Re-Stripe Crosswalks
Infrastructure
Results
$3,660,000 est. value
CA

2022 Pedestrian Crossing Enhancement Project
Infrastructure
Bidding
$339,208 est. value
Fremont, CA 94555

ADA Accessible Entry and Parking at the Diablo Range District Office
Infrastructure
Results
$285,000 est. value
Livermore, CA 94550

Foothill Pedestrian Safety Improvements
Infrastructure
Bidding
$634,500 est. value
Oakland, CA 94622

Masonic Intersections (Ohlone Trail Safety Improvements)
Infrastructure
Results
$600,000 est. value
Albany, CA 94706

Livermore Village Parking Garage Construction - Phase 1 - Trash Enclosure and Surface Lot Project
Infrastructure, Alteration
Bidding
$1,500,000 to $1,750,000 est. value
Livermore, CA 94550

Last Updated 04/12/2022 08:31 AM
Project Title

Annual Sidewalk Repair Program

Physical Address View project details and contacts
City, State (County) San Leandro, CA   (Alameda County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done consists of removal and replacement of concrete sidewalk, curb and gutter, and construction of curb ramps, and doing all appurtenant work in place and ready for use

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents