Similar Projects
Preventive Maintenance, Repair and Tank Cleaning of Asphalt Storage Tanks
Term Contract
Post-Bid

J035--RFI-Sources Sought Thermal Energy Storage Tank Repair
Post-Bid
Houston, TX 77030

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

World-Wide Water Storage Tank Remediation
Term Contract
Results

Construction of Water Plant No. 1 - Hydropneumatic Tank No. 2 Replacement
Post-Bid
Richmond, TX 77469

Homeward Way, New Territory and Thompson Chapel WP Ground Storage Tank Rehabilitation
Results
Sugar Land, TX 77479

Water Plant Expansion
Infrastructure
Post-Bid
Katy, TX 77450

Elevated Storage Tank Recoating
Results
Katy, TX 77450

Elevated Storage Tank Rehabilitation
Results
$250,000 to $350,000 est. value
Richmond, TX

Hydropneumatic Tank No 3
Results
Katy, TX

5,000-Gallon Hydropneumatic Tank Expansion
Results
$115,000 est. value
TX

Construction of Water Plant No. 1 - Hydropneumatic Tank No. 1 Replacement
Results
$139,000 est. value
Weston Lakes, TX 77441

Tamarron West Water Plant
Infrastructure
Results
$3,500,000 to $3,800,000 est. value
Fulshear, TX

Austin Parkway East, River Park South, and Greatwood West Ground Storage Tank Rehabilitation
Infrastructure
Results
Sugar Land, TX 77479

Natural Gas Inspection Services
Infrastructure
Results
$82,980 est. value
Richmond, TX 77469

Last Updated 12/30/2021 02:45 PM
Project Title

The Refurbishment of Ground Storage Tank 1 and Hydropneumatic Tank 1 and Generator Fuel Tank Expansion of Water Plant No. 1

Physical Address View project details and contacts
City, State (County) TX   (Fort Bend County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines, Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Water Plant Refurbushement which includes sand blasting the steel tanks, repairing any pinhole leaks, painting the interior and exterior of 1- 320,000-gallon ground storage tank and 1- 20,000 gallons hydropneumatics tank and complete installation of a 3,000 dual walled steel diesel tank. also, the contractor will be responsible for installing a chemical room rolling door, painting the chemical room, replacing the exhaust fan, replacing the sodium hypochlorite tank with a double walled tank and installing exterior lights to the building as well as adding a ladder safety systems for the ground storage tanks.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents