Similar Projects
Derek Apartments Phase 1
New Construction, Infrastructure - 400,000 SF
Design
$10,000,000 CJ est. value
Spokane Valley, WA 99206

Sundance III Force Main Replacement
Infrastructure
Bidding
$450,000 to $525,000 est. value
Spokane, WA

Wilbur Sidewalk Boone to Mission
Infrastructure
Bidding
$650,000 est. value
Spokane Valley, WA

Hatch Road Bridge Deck Replacement
Infrastructure
Post-Bid
$1,800,000 to $2,200,000 est. value
Spokane, WA

Bigelow Gulch Road Project Six
Alteration
Post-Bid
Spokane, WA

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

Evergreen Road Preservation
Infrastructure
Post-Bid
Spokane Valley, WA

Pedestrian Ramp Replacement
Infrastructure
Results
Deer Park, WA

Spokane Airport Board Unit Price Airside Pavement Rehabilitation
Term Contract
Post-Bid
Spokane, WA 99224

2022 Western Region Pavement Preservation MATOC
Alteration
Results
$300,000 to $10,000,000 est. value

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

2022 Eastern Region Chip Seal - South
Infrastructure
Results
$7,000,000 to $10,000,000 est. value

Landside Pavement Rehabilitation
Alteration
Post-Bid
Spokane, WA

Service Change Bus Stops Phase 1
Infrastructure
Results
Airway Heights, Liberty Lake, Spokane, Spokane Valley, WA

Reported 05/21/2022 12:00 AM
Project Title

Sprague/barker Intersection Improvement Project

Physical Address View project details and contacts
City, State (County) Spokane Valley, WA 99016   (Spokane County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For the Sprague/Barker Intersection Improvement Project. The project consists of reconstructing the intersection with a single-lane roundabout, curb ramp improvements, stormwater improvements, lighting improvements, and striping revisions with other related work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents