Similar Projects
CM/GC Hogan Construction Westlake High school Driver`s Ed. Tower
Bidding
American Fork, UT 84045

Maple Grove Middle School
New Construction
Post-Bid
Mapleton, UT 84664

ASD Micron Middle School 435
Post-Bid
Lehi, UT 84043

Franklin Discovery Academy - Construction of New Classroom Addition
Addition
Results
Vineyard, UT

Construction Manager/General Contractor Spanish Fork High School Rebuild
Results
Spanish Fork, UT 84660

DFCM Construction-Utah Schools for the Deaf and the Blind-New Springville School
Construction
Less than $10,500,000 est. value
Springville, UT 84663

Eagle Mountain UT SR Seminary
Renovation - 40,811 SF
Construction
Eagle Mountain, UT

American Heritage Phase 1C And 2A
New Construction - 86,128 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
American Fork, UT 84003

Mountain View High School Shop Remodel
Renovation
Results
Orem, UT 84057

Valley View Middle School
Construction
Salem, UT

Spanish Fork High School Bid Package 1
Post-Bid
Spanish Fork, UT 84660

Prefabricated Building Construction
Results
Salem, UT 84653

General Contractor Technology/Curriculum Building
New Construction
Construction
Spanish Fork, UT

CM/GC Westlake Driver`s Education Tower
Post-Bid
Saratoga Springs, UT 84045

Willowcreek Middle School, Foods Room Millwork Replacement
Demolition
Results
Lehi, UT 84043

Last Updated 09/19/2019 04:41 PM
Project Title

Lakeridge Junior High Science Classroom Remodel

Physical Address View project details and contacts
City, State (County) Orem, UT 84058   (Utah County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $87,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Revise the layout of the Existing Science Classrooms. The work includes, but is not limited to: 1. Interior demolition 2. New walls, doors, flooring, ceilings, and millwork 3. New finishes throughout remodel area 4. New mechanical ducting and diffusers to support remodeled area 5. New electrical to support remodeled area. 6. New AV equipment to support remodeled area
Details
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents