Similar Projects
Landfill Heating Cooling Unit
Alteration
Bidding
Cortez, CO

RTU Replacement Persigo WWTP
Alteration
Bidding
Grand Junction, CO 81505

Classroom Heating/Cooling Systems at Kemper, Mesa and Manaugh Elementary and Cortez Middle School
Post-Bid
Cortez, CO

Replace Chiller, McKee Hall
Post-Bid
Greeley, CO 80639

Air Traffic Control Chillers
Results
Aurora, CO 800119589

Repair HVAC Harmon Hall Arnold Hall
Results
$1,000,000 to $5,000,000 est. value
Colorado Springs, CO 80840

HVAC Mechanical Services
Term Contract
Post-Bid
Littleton, CO 80120

AHU Project at Denver Air Route Traffic Control Center for HVAC Contractor
Results
$200,000 to $300,000 est. value
Longmont, CO

On Call Test and Balance for HVAC Systems
Post-Bid
CO

Regional Center Capital Improvements GJRC Group Home A/C FY 17-18
Results
$278,910 est. value
Grand Junction, CO 81504

Bi-Annual Preventative Maintenance and As-Needed Repair Services for HVAC System
Term Contract
Post-Bid
Aspen, CO 81611

A/C Replacement at 1525 Sherman Street Lobby
Results
Denver, CO

2020-090M19 Hvac Replacement & Controls Upgrade
Post-Bid
$656,246 est. value
Fort Morgan, CO

HVAC System for Academy C-7 Wing, Building 120
Results
Less than $133,000 est. value
Golden, CO 80401

Domestic Water and Heating Pipe Insulation
Post-Bid
Boulder, CO 80303

Last Updated 06/23/2021 10:58 AM
Project Title

Wave Pool Mechanical Room Cooling for Central Recreation Center

Physical Address View project details and contacts
City, State (County) Aurora, CO 80013   (Arapahoe County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $20,000 to $30,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Wave Pool Mechanical Room Cooling for Central Recreation Center project consists of the following: 1. Furnish, installation, and start-up (1) Mitsubishi PKA-A36 Split System (with T-stat & condensate pump) or equivalent, for the wave pool mechanical room at Central Recreation Center. 2. Route condensate line to nearest floor drain as indicated on mechanical drawing. 3. Contractor shall provide all core drilling, demo, conduit, wiring, connections and all other necessary work to complete project. 4. Ground Penetrating Radar or X-Ray shall be required prior to any core drilling. 5. All work shall be in conformance with the attached plans and specifications..

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents