Similar Projects
Beckham's Miami Freedom Park - United Major League Soccer Stadium
New Construction - 1,000,000 SF
Conception
$1,000,000,000 est. value
Miami, FL

Olympus Master Plan
New Construction - 861,283 SF
Conception
$10,000,000 CJ est. value
Clermont, FL 34711

Former Flea World Redevelopment
New Construction - 2,400,000 SF
Design
Sanford, FL 32773

MCID-2
New Construction, Renovation, Build-Out - 1,141,800 SF
Design
$10,000,000 est. value
Miami, FL

Woodspring Suites / Port Orange
New Construction - 48,660 SF
Bidding
$12,000,000 est. value
Port Orange, FL 32127

Home2 Suites
New Construction - 49,088 SF
Sub-Bidding
$7,300,000 est. value
Vero Beach, FL 32966

Homewood Suites by Hilton
New Construction, Build-Out - 103,709 SF
Post-Bid
$7,000,000 est. value
Fort Lauderdale, FL 33308

Legacy Hotel & Residences
New Construction - 1,013,840 SF
Post-Bid
Miami, FL 33132

Y--Design-Bid-Build of Navy Gateway Inn and Suites (NGIS) Facility, Naval Station Mayport, Florida
- 77,150 SF
Results
$25,000,000 to $100,000,000 est. value
Mayport, FL 32233

Redevelopment of Fisherman's Wharf
Results
$26,000,000 est. value
Fort Pierce, FL 34954

Miami River
New Construction - 3,678,706 SF
Construction
Less than $310,000,000 est. value
Miami, FL

Hyatt Place
New Construction - 133,000 SF
Construction
$32,800,000 est. value
Gainesville, FL

Miramar Beach Resort
New Construction - 47,170 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Saint Pete Beach, FL 33706

Thompson Hotel - Hyatt
New Construction - 111,000 SF
Pending Verification
Tampa, FL 33602

Candlewood Suites
New Construction - 44,207 SF
Conception
Saint Augustine, FL 32092

Last Updated 06/28/2022 02:57 AM
Project Title

StayAPT

Physical Address View project details and contacts
City, State (County) Tallahassee, FL   (Leon County)
Category(s) Commercial
Sub-Category(s) Hotel/Motel
Contracting Method Bids by Invitation.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $6,500,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Site work, paving and new construction of a hospitality development in Tallahassee, Florida. Completed plans call for the construction of a 45,020-square-foot, three-story above grade hospitality development; and for site work for a hospitality development. Scope includes but is not limited to: Material Testing, Concrete, Masonry, Structural Steel, Misc. Steel, Rough Carpentry, Millwork, Roofing, Siding, EIFS, Doors & Hardware, Storefront, Manufactured Windows, Gypsum assemblies, Paint, Flooring, Tile, ACT, Restroom Accessories, Elevator, HVAC, Plumbing, Electrical, Landscape and Asphalt Pavement.

Details

Hotel/Motel, 3 Stories Above Grade, 45,020 SF New Construction 57 Unit(s), 1.61 Acres.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 14 - Conveying Equipment, Elevators.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents