Similar Projects
Replace Chiller Plants/Cooling Towers
Infrastructure
Design
Philadelphia, PA 19106

HVAC and ATC Services - DVVH
Term Contract
Bidding
Philadelphia, PA 19154

HVAC and Plumbing
Alteration
Bidding
Philadelphia, PA

Tower Site HVAC Equipment Maintenance
Term Contract
Post-Bid
PA

Air Filter
Post-Bid
Newtown, PA 18940

Air Filter
Results
Newtown, PA

High School North Administration HVAC Replacement
Results
Newtown, PA 18940

Bensalem High School Gym HVAC Upgrades Project
Alteration
Bidding
Bensalem, PA 19020

HVAC and Mechanical Products
Term Contract
Post-Bid

Senior Center HVAC
Results
Bensalem, PA 19020

Poquessing Middle School - Chiller Replacement
Post-Bid
Feasterville, PA 19053

Bensalem Township Public Works HVAC Replacement
Results
Bensalem, PA 19020

Smoke and Fire Damper Corrections
Post-Bid
Warrington, PA 18976

Hicks Art Center Ceramics Room HVAC Project
Results
Newtown, PA

Exhaust Vent Cleaning Grundy Manor
Alteration
Post-Bid
Telford, PA 18969

Reported 01/08/2022 12:00 AM
Project Title

NFPC Inductotherm Coreless Induction Furnace Realignment

Physical Address View project details and contacts
City, State (County) Philadelphia, PA   (Bucks County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Naval Foundry and Popeller Center (NFPC) in Philadelphia has a requirement for relining of Inductotherm Coreless Induction Furnace. The furnance is also known as the FB-12, 3Ton and FB-9, 25Ton furnace. After completion of the relining, the furnace shall be fully operational and in good working condition. Reline the 3-Ton (FB-12): 3.1.1 The contractor shall remove the existing lining and install a new lining in the 3-Ton (FB-12) Coreless Induction Furnace. 3.1.2. The contractor shall remove the existing lining back to the split brick on the side walls of the furnace. 3.1.3. The contractor shall remove old monolithic plastic from the spout area and remove the old ground fault detection wiring from the base of the furnace. 3.1.4. The contractor shall remove all debris caused by the removal of the existing liner. 3.1.5. The contractor shall apply a new micro-weave cloth over the split brick and install a new ground fault detection wiring assembly. 3.1.6. The contractor shall provide a finished work surface on the top of the furnace. As a courtesy, the Government estimates the required quantities of materials in section 3.1.7 of the Statement of Work. If the estimated quantities of materials are not sufficient, the contractor is still required to complete the work at no additional cost to the Government unless the additional cost is unreasonable. 3.1.7. The contractor shall provide and install the following: 3 ton liner form in stock Allied Mineral’s dri-vibe 697 Allied Mineral’s dri-vibe 493 top cap 1 roll Minro weave cloth, 2/each of thermocouples Reline the 25-Ton (FB-9): 3.2.1. The contractor shall remove the existing lining and install a new lining in the 25- Ton (FB-9) Coreless Induction Furnace. 3.2.2. The contractor shall remove the existing lining back to the split brick on the side walls of the furnace. 3.2.3. The contractor shall remove old monolithic plastic from the spout area and remove the old ground fault detection wiring from the base of the furnace. 3.2.4. The contractor shall remove all debris caused by the removal of the existing liner. 3.2.5. The contractor shall apply a new micro-weave cloth over the split brick and install a new ground fault detection wiring assembly. 3.2.6. The contractor shall provide a finished work surface on the top of the furnace. As a courtesy, the Government estimates the required quantities of materials in section 3.1.7 of the Statement of Work. If the estimated quantities of materials are not sufficient, the contractor is still required to complete the work at no additional cost to the Government unless the additional cost is unreasonable. 3.2.7. The contractor shall provide and install the following: 3 ton liner form in stock Allied Mineral’s dri-vibe 697 Allied Mineral’s dri-vibe 493 top cap 1 roll Minro weave cloth, 2/each of thermocouples 1/each leak detector wire assembly

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Furnaces, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents