Similar Projects
Section A Waterline and Section B Stand Pipe Painting and Rehabilitation
Infrastructure
Post-Bid
Taft, OK

W912bv21r0047-Presolicitation Notice (Sources Sought)- Bureau of Reclamation Waterline Relocation, Tinker AFB
Term Contract
Post-Bid
$5,000,000 to $10,000,000 est. value
Oklahoma City, OK 73145

100-200 Block East Garriott Road Waterline Relocation
Results
Enid, OK

1500-2500 Block of North Cleveland Street Waterline Relocation
Results
Enid, OK 73703

AMI Electric and Water Meter Installation
Infrastructure
Post-Bid
Edmond, OK

1000-1600 Block East Pine Avenue Waterline Relocation
Results
Enid, OK 73701

New Splash Pad at the Atoka Sports Complex
New Construction, Infrastructure
Post-Bid
Less than $250,000 est. value
Atoka, OK 74525

1600-1900 Block East Birch Avenue Water Line Relocation
Results
OK

Kunkle Valve Replacement
Alteration
Post-Bid
Norman, OK 73019

Operation, Maintenance and Repair Services
Term Contract
Results
Oklahoma City, OK

AMI-AMR Water and Electric Meters
Infrastructure
Post-Bid
Lindsay, OK

Section II - 72-Inch Water Transmission Main Improvements
Infrastructure
Results
$5,467,875 est. value
Oklahoma City, OK

Water Line Extensions 2021
Infrastructure
Post-Bid
Duncan, OK

Waterline Replacement Northwest 4th Street and Shartel Avenue
Infrastructure
Results
Oklahoma City, OK

Construction of Section A and B
Infrastructure
Post-Bid
Taft, OK

Last Updated 04/19/2022 09:22 AM
Project Title

Tower-4 Water Line

Physical Address View project details and contacts
City, State (County) Edmond, OK   (Oklahoma County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 00 - Procurement and Contracting Requirements.
Division 01 - General Requirements.
Division 26 - Electrical.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 40 - Process Integration.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents