Similar Projects
Stormwater Utility On-Call Contractors
Post-Bid
Duluth, GA

Prequalified Contractors List
Post-Bid
East Point, GA

Water, Waste Water, and Storm Water Run-Off Usage at The Gillem Enclave
Results
Forest Park, GA 30297

Green Infrastructure Design Challenge - Continental Colony Elementary
Results
Atlanta, GA 30331

Statewide Drainage Asset Management Program
Post-Bid

Edgehill Place Storm Drainage Repair
Results
Johns Creek, GA

Sewer System Evaluation Surveys
Post-Bid
Lake City, GA 30260

Taylor Road and Batesville Road Stormwater Improvement
Results
Less than $49,901 est. value
Milton, GA

Design Build Services for Campus Infrastructure
Post-Bid
Less than $2,300,000 est. value
Morrow, GA 30260

Row Storm Pipe Repair Project
Results
Less than $29,811 est. value
Johns Creek, GA 30097

On-Call Storm Pipe Cleaning
Term Contract
Results
Less than $75,000 est. value
Alpharetta, GA 30009

MS4 Stormwater Inventory Inspections
Term Contract
Results
Alpharetta, GA 30009

North Powers Ferry Phase 2 Stormwater BMP Maintenance
Results
Less than $107,984 est. value
Sandy Springs, GA 30328

821 Tanglewood Trail Stormwater Improvement
Results
Sandy Springs, GA

4934 Peachtree Dunwoody Stormwater System Improvement
Results
Less than $38,538 est. value
Sandy Springs, GA 30328

Reported 02/16/2021 12:00 AM
Project Title

Combined Sewer Replacement

Physical Address View project details and contacts
City, State (County) Atlanta, GA (Clayton, Fulton Counties)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

Combined Sewer Replacement Project will include roughly 1,000’ of DIP combined sewer replacements for sizes up to 54” diameter pipe. The work will take place adjacent to a railroad track in Downtown Atlanta. The project will include a 38% EBO participation goal. Main work features include, but not limited to the following: Utility and Manhole Installation Support of Excavation for adjacent structures Utility work adjacent to active railroad track Jack & Bore under active railroad tracks E&S Controls Pavement Repair CCTV of New Utility Installation Qualifications To Bid: Bonding capacity must be equal to or greater than job cost Must have experience with Support of Excavation for adjacent structures deeper than 40’ Must have experience with jack & bore adjacent to active railroad tracks Project will include a 38% EBO participation goal.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents