Similar Projects
Pavement Milling and Ultra-Thin Bonded Wearing Course
Bidding
Caribou, New Sweden, Woodland, ME

Asphalt Street Paving 2021
Bidding
Houlton, ME

Paving Project
Post-Bid
Mapleton, ME

Roads Grading/Street Sweeping/Heating
Post-Bid
Island Falls, ME

Hodgdon High School Paving Project
Results
Hodgden, ME 04730

Road Work on Sly Brook Road
Results
Eagle Lake, ME

Road Paving
Post-Bid
Saint Agatha, ME

Pavement Milling and Hot Mix Asphalt Overlay/Project is Located in Mars Hill on US Route 1 Beginning 0.01 Mile North of the US Route 1A Intersection and Extending North 1.57 Miles
Results
Less than $505,000 est. value
Mars Hill, ME 04758

Asphalt Street Paving 2020
Post-Bid
Houlton, ME

Crack Sealing
Results
ME

Paving of Three Streets
Post-Bid
Westfield, ME

Pavement Milling, Hot Mix Asphalt Overlay with Drainage and Safety Improvements
Results
ME

Airport Crack Sealing/Repair Project
Post-Bid
Less than $23,500 est. value
Presque Isle, ME

Pavement Milling, Hot Mix Asphalt Overlay, and Ultra-Thin Bonded Wearing Course
Results
Blaine, Bridgewater, Caribou, Monticello, ME 04734

2021-2022 Town Paving Projects
Term Contract
Post-Bid
Madawaska, ME

Last Updated 03/25/2021 04:43 AM
Project Title

(LCP) Light Capital Paving

Physical Address View project details and contacts
City, State (County) Caribou, Easton, Mapleton, Mars Hill, Perham, Presque Isle, Wade, Washburn, Westfield, Woodland, ME 04740   (Aroostook County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,064,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work Consists of Light Capital Paving and other Incidental Work. Total Length is 43.04 miles The Work Includes Construction, Maintenance During Construction, Warranty As Provided In The Contract, And Other Incidental Work. Furnishing All Supervision, Labor, Equipment, Tools Supplies, Permanent Materials And Temporary Materials Required To Perform The Work Including Construction Quality Control Including Inspection, Testing And Documentation, All Required Documentation At The Conclusion Of The Project, Warranting Its Work And Performing. Map ID 1 is in Easton on the West Ridge Road beginning 0.20 miles west of the intersection with the Bangor Road and extending easterly and northerly to the intersection with Route 10. Includes paving shoulders. Map ID 2 is in Presque Isle and Caribou on the Mcburnie Road and the West Presque Isle Road beginning on the Mcburnie Road at the intersection with Route 164 and extending northerly to intersection with the West Presque Isle Road, the continuing northerly on the West Presque Isle Road to 0.19 miles north of the Presque Isle/Caribou city line. Includes paving shoulders. Map ID 3 is in Easton on the Ladner Road beginning at the intersection with Route 1A and extending easterly and southerly to 0.48 miles south of the intersection with the Mahoney Road. Includes paving shoulders. Map ID 4 is in Mapleton on the Hughes Road beginning at the intersection with Route 163 and extending northerly to the intersection with Route 227. Map ID 5 is in Westfield and Mars Hill on the Burleigh Road, the Easton Viner Road, the Mars Hill Road, and the Westfield Road beginning on the Burleigh Road at the intersection with Route 1 and extending easterly to the intersection with the Easton Viner Road, then continuing northerly on the Easton Viner Road to the intersection with the Mars Hill Road, then continuing easterly on the Mars Hill Road to the Westfield Road, then continuing easterly on the Westfield Road to the intersection with the West Ridge Road. Includes milling and paving Bridge #5037. Map ID 6 is in Presque Isle and Washburn on Route 164 beginning at the Compact Urban Line 0.60 miles northwest of the intersection with the Ouellette Road and extending northwesterly to the intersection with Berce Street. Includes paving shoulders and milling and paving Bridge #3630. Map ID 7 is in Washburn, Wade, Perham, Woodland, and Caribou on Route 228 beginning 0.39 miles north of the intersection with Durost Drive and extending northwesterly and easterly to the Compact Urban Line 10 at the intersection with the Lombard Road. Includes paving shoulders and milling and paving Bridge #

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents