Similar Projects
Last Updated | 04/03/2020 03:19 PM |
Project Title | Whitlock Wtp Inlet Hydroelectric Water Turbine Package |
Physical Address | View project details and contacts |
City, State (County) | Pueblo, CO 81003 (Pueblo County) |
Category(s) | Single Trades |
Sub-Category(s) | Equipment |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | furnish one (1) or two (2) hydroelectric water turbine(s) for use at their Whitlock Water Treatment Plant. Along with the turbine(s), additional equipment shall be provided as part of the package including the Generator and Exciter, Control System, and Hydraulic Power Unit (HPU)with electric motors, starters, controls, wiring within the skid, and associated piping on the skid. Interconnecting wiring and piping between the HPU, Control Panel, valves and turbine will be provided and installed under a separate Contract. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |