Similar Projects
Chester-Tomnolen Road Soil Cement and DBST
Infrastructure
Bidding
MS

Annual Contract for Limestone
Term Contract
Bidding
MS

Annual Full Depth Reclamation
Post-Bid
Southaven, MS

2021 Overlay Petal
Post-Bid
Petal, MS

Mill and Overlay
Results
MS

Safety Improvements
Results

Eason Boulevard Improvements, Veterans Boulevard to Briar Ridge
Infrastructure
Bidding
Tupelo, MS 38804

Ready Mix Concrete
Post-Bid
Gulfport, MS

Mill and Overlay
Results
MS

Overlay on the Old West Point Road
Infrastructure
Bidding
Columbus, MS 39704

Micro-Surfacing Per Square Yard
Term Contract
Post-Bid
MS

Mill, Overlay and Stripe Approximately 2 Miles on I-69 from the Concrete Section to Tennessee State Line
Results
MS

Asphalt Milling of Existing Asphalt Surfaces and Furnishing HMA Bituminous Plant Mixes
Infrastructure
Bidding
Diberville, MS

Hardy Street Roundabout Project at 2nd Avenue/Green Street/Adeline Street
Post-Bid
$1,400,000 to $1,500,000 est. value
Hattiesburg, MS 39407

Overlay
Results

Reported 03/29/2022 12:00 AM
Project Title

Construction Materials

Physical Address View project details and contacts
City, State (County) Natchez, MS   (Adams County)
Category(s) Heavy and Highway
Sub-Category(s) Aggregates, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing general supplies, construction materials, traffic supplies, and contract services, as needed to be delivered to the site of various Public Works, Traffic, and Water Works projects within the corporate limits of the City of Natchez, Mississippi or its jurisdiction, for a one (1) year period beginning April 1, 2022 and ending March 31, 2023, excluding Street Striping, Street Cut (Utility Trench) Patching, Hot Mix Asphalt, and Lay Down of Hot Mix Asphalt. Street Striping, Street Cut (Utility Trench) Patching, Hot Mix Asphalt, and Lay Down of Hot Mix Asphalt items will bid for a (6) six-month period beginning April 1, 2022 and ending September 30, 2022.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Aggregate Surfacing, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents