Similar Projects
Comprehensive Infrastructure for Tampa’s Neighborhoods - Design-Build
Design
Less than $4,362,009 est. value
Tampa, FL 33602

Construction Services for Poitras East Community Development District
Post-Bid
FL

Stormwater Drainage Expertise Lakewood Ranch Inter-District Authority Community Development District 5
Post-Bid
Lakewood Ranch, FL 34202

Storm Sewer Rehabilitation by Cured-In-Place Pipe (CIPP) Technology
Results
Less than $304,580 est. value
Jacksonville, FL

Y--IGF::OT::IGF RV Work Camp Sewer Connection
Results
Less than $25,000 est. value
Big Pine Key, FL

Stormwater Improvements
Construction
Lake City, FL 32055

Mirada Active Adult Phase 1 (Mirada Boulevard Phase 3B)
Post-Bid
San Antonio, FL 33576

Plugged Storm Drains
Results
Everglades, FL

Teak Follow Boulevard North, Phases 1 and 2
Post-Bid
San Antonio, FL 33576

East College, East Jefferson & South Meridian Streets Water and Sewer Improvements
Results
Less than $2,739,200 est. value
Tallahassee, FL

South Campus Stormwater Management - DRA #4 Project
Post-Bid
Pembroke Pines, FL 33024

Stormwater Management System Prevent Maintenance
Term Contract
Results
Sunny Isles, FL 33160

Abandonment of Existing Septic System
Post-Bid
Orlando, FL 32805

Pre-Cast Storm Water Control Stuctures
Results
Kissimmee, FL 34741

Blue Lake Elementary - Stormwater Drainage Upgrade
Post-Bid
De Land, FL 32724

Last Updated 06/05/2020 09:29 AM
Project Title

SRF Sewer Rehabilitation, Phase 1A

Physical Address View project details and contacts
City, State (County) Macclenny, FL   (Baker County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,720,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project involves rehabilitation of a portion of the City of Macclenny`s wastewater collection system. Work includes the following: removal of approximately 6,300 LF of 4" through 10" PVC, VCP, and ACP gravity sewer pipe; grouting of approximately 1,800 LF of 6" and 8" gravity sewer pipe; removing 50 existing brick and precast manholes; installing approximately 7,300 LF of 8" and 10" PVC gravity sewer; 60 new precast manholes; removal and replacement of 150 sanitary sewer services totaling 3,800 LF of pipe; 24,200 LF of CIPP ranging from 6" to 15" diameter; pipe bursting 330 LF of 6" and 8" pipe; chain cutting 6,250 LF of 6" to 15" gravity sewer; 1,700 LF of chemical root treatment; rehabilitating approximately 125 manholes including lining and new frames and covers; cleaning and televising approximately 2,300 LF of existing gravity sewer pipe; and associated restoration. Bids will be received for a single prime Contract.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents