Similar Projects
Cape May Terminal Police Dispatch Center Rehabilitation
Addition, Demolition, New Construction, Renovation, Infrastructure
Bidding
$805,000 CJ est. value
Cape May, NJ 08204

21st Street and 25th Street Bridges Over Avalon Canal Scour / Erosion and Substructure Repairs
Infrastructure
Bidding
$200,000 CJ est. value
Avalon, NJ 08202

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Emergency Repairs to Utilities at Various State Secured Facilities
Term Contract
Post-Bid

Emergency Repairs To Utilities at Various State Non-Secured Facilities
Term Contract
Results

Emergency Repairs to Utilities at Various State Secured Facilities
Term Contract
Results

Beach Avenue Hotel
New Construction, Infrastructure
Pending Verification
$150,000,000 CJ est. value
Cape May, NJ 08204

114th Street Sanitary Sewer Main Rehabilitation
Infrastructure
Bidding
$300,000 CJ est. value
Stone Harbor, NJ 08247

Water Meter Replacement Program
Infrastructure
Post-Bid
Avalon, NJ

Maintenance and Repair: Water Meters, Remote Reading Device Touch Pads and MXUs and SmartPoint - Testing, Repairing and Installation
Term Contract
Results

Franklin Street & Adams Avenue Reconstruction & Water System Improvements
Infrastructure
Bidding
$740,000 CJ est. value
Woodbine, NJ 08270

Fabrication and/or Installation of Structural Steel & High and Low Pressure Pipe Work
Infrastructure
Post-Bid
$190,000 CJ est. value
Camden, NJ 08104

Del Haven Water Main Extension
Infrastructure
Results
Lower Township, NJ

Pier Fender Replacement and Repairs at Cape May and Lewes Terminals
Infrastructure
Bidding
$1,000,000 CJ est. value
Cape May, NJ 08204

Ockie Wisting Site Improvements
Infrastructure
Post-Bid
$302,000 est. value
Rio Grande, NJ 08242

Last Updated 09/26/2022 09:02 AM
Project Title

Watermain Replacements on the Garden State Parkway and New Jersey Turnpike, Various Locations

Physical Address View project details and contacts
City, State (County) Cape May, NJ 08204   (Cape May County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected October 2022 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $1,494,505 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

It is essential that any contaminated soil or groundwater encountered during the Project be handled in a manner that is protective of human health, safety, and the environment. This Section describes procedures for the management of regulated material (contaminated or potentially contaminated soil and/or groundwater) that may be encountered throughout the Project area. The work shall include the excavation, handling, stockpiling, sampling, analysis, and the ultimate disposal or reuse of contaminated soil, if encountered. The work shall also include the dewatering, treatment, sampling, analysis, and the ultimate disposal of contaminated groundwater, if encountered. Proposals are invited for Contract No. A900.655, which involves the replacement of 1.5-inch, 2-inch, 3-inch, 4-inch and 6-inch water mains at the Pleasant Plains Police Barracks (GSP Milepost 83.8), Garden State Parkway Interchange 109 Toll Plaza (GSP Milepost 109.8 to 110.4), Raritan Toll Plaza Safety Building ( GSP Milepost 125.6 to 125.7), and the New Jersey Turnpike Authority Maintenance Yard TMD-10 (TP Milepost 112.7S) in the Township of Toms River, Township of Middletown, Borough of Sayreville, and the Borough of East Rutherford, New Jersey. Trench Excavation, Earth - 2494 Cubic Yards 6in Ductile Iron Water Pipe, Class 350 - 1845 Linear Feet 12 Inch Trenchless Installation - 146 Linear Feet 2in Copper Water Pipe, Type K - 1255 Linear Feet All work under the Contract shall be performed and completed on or before August 4, 2023 If the Contractor fails to complete fully, entirely and in conformity with the provisions of the Contract, the Project and each and every part and appurtenance thereof, within the time stated above, or any portion for which a Completion Date is stipulated within such further time as may have been granted in accordance with the provisions of the Contract, then the Contractor shall and hereby agrees to pay the Authority for each and every calendar day that it is in default on time to complete the entire Project, $2,000 which said amount per calendar day is agreed upon by the parties hereto to be liquidated damages and not a penalty. (a)If said Proposal shall be rejected by the New Jersey Turnpike Authority, or in the alternative, (b) If said Proposal shall be accepted by the New Jersey Turnpike Authority, and the Principal shall duly execute the Contract Agreement and furnish the required Contract Bond, within the stipulated time, Then this obligation shall be void, otherwise the same shall remain in force and effect; it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the amount of this obligation as herein stated.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents