Similar Projects
Last Updated | 09/26/2022 09:02 AM |
Project Title | Watermain Replacements on the Garden State Parkway and New Jersey Turnpike, Various Locations |
Physical Address | View project details and contacts |
City, State (County) | Cape May, NJ 08204 (Cape May County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Contract Award, Request for Qualifications, Construction start expected October 2022 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $1,494,505 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | It is essential that any contaminated soil or groundwater encountered during the Project be handled in a manner that is protective of human health, safety, and the environment. This Section describes procedures for the management of regulated material (contaminated or potentially contaminated soil and/or groundwater) that may be encountered throughout the Project area. The work shall include the excavation, handling, stockpiling, sampling, analysis, and the ultimate disposal or reuse of contaminated soil, if encountered. The work shall also include the dewatering, treatment, sampling, analysis, and the ultimate disposal of contaminated groundwater, if encountered. Proposals are invited for Contract No. A900.655, which involves the replacement of 1.5-inch, 2-inch, 3-inch, 4-inch and 6-inch water mains at the Pleasant Plains Police Barracks (GSP Milepost 83.8), Garden State Parkway Interchange 109 Toll Plaza (GSP Milepost 109.8 to 110.4), Raritan Toll Plaza Safety Building ( GSP Milepost 125.6 to 125.7), and the New Jersey Turnpike Authority Maintenance Yard TMD-10 (TP Milepost 112.7S) in the Township of Toms River, Township of Middletown, Borough of Sayreville, and the Borough of East Rutherford, New Jersey. Trench Excavation, Earth - 2494 Cubic Yards 6in Ductile Iron Water Pipe, Class 350 - 1845 Linear Feet 12 Inch Trenchless Installation - 146 Linear Feet 2in Copper Water Pipe, Type K - 1255 Linear Feet All work under the Contract shall be performed and completed on or before August 4, 2023 If the Contractor fails to complete fully, entirely and in conformity with the provisions of the Contract, the Project and each and every part and appurtenance thereof, within the time stated above, or any portion for which a Completion Date is stipulated within such further time as may have been granted in accordance with the provisions of the Contract, then the Contractor shall and hereby agrees to pay the Authority for each and every calendar day that it is in default on time to complete the entire Project, $2,000 which said amount per calendar day is agreed upon by the parties hereto to be liquidated damages and not a penalty. (a)If said Proposal shall be rejected by the New Jersey Turnpike Authority, or in the alternative, (b) If said Proposal shall be accepted by the New Jersey Turnpike Authority, and the Principal shall duly execute the Contract Agreement and furnish the required Contract Bond, within the stipulated time, Then this obligation shall be void, otherwise the same shall remain in force and effect; it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the amount of this obligation as herein stated. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |