Similar Projects
Exterior Door Replacement, Colonial Gardens 667-1
Alteration
Bidding
$213,674 est. value
Lynnfield, MA

Overhead Door Maintenance Services Statewide
Post-Bid
Less than $200,000 est. value

Dickson Chapel Doors Replacement (Greenlawn Cemetery)
Post-Bid
Less than $42,000 est. value
Salem, MA 01970

Bay Window Replacements
Results
Less than $19,000 est. value
Wenham, MA 01984

On-Call Door and Lock Installation and Repairs
Results
Less than $150,000 est. value
Lawrence, MA 01840

Lawrence Heritage Visitor Center Window and Door Replacements
Post-Bid
$275,000 est. value
Lawrence, MA 01841

Furnish and Install Window Shades as Needed
Term Contract
Results
Lawrence, MA

Essex County H.O.C. 80 Bed and Voc Tech Buildings Facade/HVAC
Post-Bid
Less than $3,155,494 est. value
Middleton, MA

Exterior Door Repairs
Results
Less than $63,600 est. value
Georgetown, MA

John R. Rollins School Window Replacement
Results
Less than $200,000 est. value
Lawrence, MA 01840

667-2 Exterior Door Replacement
Results
Less than $158,000 est. value
Manchester, MA

Security Upgrades at O'Maley Middle School and Gloucester High School
Results
Less than $1,500,000 est. value
Gloucester, MA 01930

O'Keefe Roof Replacement - Filed Sub-Bids
Results
Less than $3,550,188 est. value
Salem, MA 01970

Door Hardware Replacement
Results
Less than $139,080 est. value
Salem, MA

Amesbury Public Library - Window Restoration Services
Results
Less than $44,000 est. value
Amesbury, MA 01913

Last Updated 01/28/2022 09:26 AM
Project Title

Rollins School Window Replacement Phase 2

Physical Address View project details and contacts
City, State (County) Lawrence, MA 01841   (Essex County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work under this contract requires a contractor to provide labor, material, equipment, transportation and supervision necessary for the replacement of basement and first floor windows and associated work at Rollins School.

Details

Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents