Similar Projects
Last Updated | 10/05/2023 04:35 AM |
Project Title | Westlake Park Irrigation System Construction |
Physical Address | View project details and contacts |
City, State (County) | Grand Junction, CO 81501 (Mesa County) |
Category(s) | Single Trades |
Sub-Category(s) | Equipment |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected September 2023 |
Bids Due | View project details and contacts |
Estimated Value | $636,766 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Reference Number 0000326617 *The City of Grand Junction is soliciting competitive bids from qualified and interested Contractors for all labor, equipment, and materials required for the Westlake Park Irrigation System Construction. All dimensions and Scope of Work shall be verified by Contractors prior to submission of bids.* Question Acceptance Deadline 08/17/2023 at 5:00 PM MT Questions are submitted online No General Requirements - FOB Destination - FOB Pre-Paid - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % The goal of the Westlake Park Irrigation System Project is to replace the entire irrigation system. This Project will replace all mainline, lateral line, communication lines, valve, and sprinklers in the park to provide even and efficient water distribution to the existing grass and the future improvements of the park. This Project includes the material sourcing and installation of the communication system, the filtration system, the drip system, and sprinkler systems, while installing and maintaining the tree protection zones provided in the plan set. During this Project's work, the sidewalks, playgrounds and skateparks are to stay open and clean. The disk golf course will be closed. Open trenches will be made obvious to park users and back filled/water settled once pipe is installed. The pump house will be reconfigured using the existing pump. At completion of the Project, the selected Contractor will provide the City with an accurate as built document and GPS coordinates for valves, mainlines (every 20'), and the communication path (every 20'). The Contractor will provide a warrantee on all work for 1 year after the date of completion. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |