Similar Projects
FM2502 - Culvert Replacement
Infrastructure
Bidding
$277,484 est. value
TX

SH0036 - Flexible Base
Infrastructure
Bidding
$75,000 est. value
TX

Old Chappell Hill Road Improvements
Post-Bid
$773,000 est. value
Brenham, TX 77833

Seal Coating and Asphalt Services
Post-Bid
TX

Southern Region Disaster Recovery Support BPA
Results

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

SH0036 - Spot Base Repair
Post-Bid
$929,251 est. value
TX

Z--IDIQ for Stream Gage Site Rprs, Oklahoma and Texas
Results

Construction of Prairie Lea Cemetery Expansion
Infrastructure
Post-Bid
Brenham, TX 77833

2020 Salem Road Street Improvements
Results
$1,350,000 est. value
Brenham, TX 77834

Grease Line Repairs/Maintenance
Term Contract
Results
Independence, TX 77833

US0290- Hma Mill and Inlay Highway
Results
Less than $984,574 est. value
TX

Washington County 2020 CTIF Award
Results
Less than $459,000 est. value
Brenham, TX 77833

2021 Group Seal Coat Program
Results

Hickory Lane Drainage Improvements
Results
$173,000 est. value
Brenham, TX 77833

Last Updated 01/27/2022 12:30 PM
Project Title

Sandalwood Manufactured Home Community Expansion

Physical Address View project details and contacts
City, State (County) TX   (Washington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Shoreline/Erosion/Drainage, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $510,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes constructing reinforced concrete pavement and drainage improvements; site grading; furnishing and installing street lights, eight-inch water line with appurtenances and services, six-inch sanitary sewer line with manholes, cleanouts and services for expansion of Sandalwood Manufactured Home Community in Washington County, Texas.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents