Similar Projects
Flight Test Apron Hill Air Force Base
Term Contract
Design
$5,000,000 to $10,000,000 est. value
Hill AFB, UT 84056

Bryce Canyon Airport
Infrastructure
Bidding
$139,000 est. value
Bryce, UT 84764

Milford Municipal Airport / Ben and Judy Briscoe Field
Infrastructure
Bidding
$630,000 est. value
Milford, UT 84751

Improvements to the Cal Black Memorial Airport
Post-Bid
Halls Crossing, UT

SLC Airport Taxiway G Centerline PCC Panel Replacement
Post-Bid
Salt Lake City, UT

Construction of the Castle Dale Chip Seal Project 2021
Results
Castle Dale, UT

FY2021 Pavement Maintenance Project
Results
$270,897 est. value
Nephi, UT

West 388Th/419Th Fighter Wing Apron at Hill AFB
Term Contract
Post-Bid
$25,000,000 to $100,000,000 est. value
Hill AFB, UT

FY 2021 Pavement Maintenance Project
Results
$76,745 est. value
Ephraim, UT

Salina Gunnison Airport Runway Reconstruction
Infrastructure
Post-Bid
Gunnison, UT

Improvements to the Manti-Ephraim Airport
Results
$406,500 est. value
Ephraim, UT 84627

SLC Airport Redevelopment Program Design Package 20 Project
New Construction, Alteration
Post-Bid
Salt Lake City, UT 84122

ARC Upgrade: Runway 3/21 Improvements (Phase II)
Results
UT

DBB, North and Flight Test Apron Repairs, Hill Air Force Base, UT
Term Contract
Post-Bid
$5,000,000 to $10,000,000 est. value
Hill AFB, UT

Monticello Municipal Airport
Infrastructure, Alteration
Results
$215,000 est. value
Monticello, UT

Reported 06/07/2022 04:55 PM
Project Title

TVY Runway and Taxiway Rehabilitation

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84116   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Project Delayed
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is a continuing phase to maintain the Airport’s infrastructure. The project will consist of a surface preparation and an asphalt overlay to prolong the service life of the Airport’s pavement. The project will consist of partial depth profile milling and a 3-inch asphalt overlay over the entire length and width of the runway, parallel taxiway and all connecting taxiways. The existing incandescent runway and taxiway edge lights will be removed and replaced with new energy efficient LED lights along with replacement of the aging airfield signs

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents