Similar Projects
Last Updated | 02/15/2019 09:41 AM |
Project Title | UAB Spain Wallace AHU - 10 and AHU - 11 Replacement |
Physical Address | View project details and contacts |
City, State (County) | Birmingham, AL (Jefferson County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Scope of Work consists of replacing two existing Hot/Cold Deck Built-up Air Handling Units with two (2) new Custom Air Handling Units, modification of the duct systems, and modifications to the existing pneumatic HVAC controls in the Spain Wallace Building. The work will be performed within an operating hospital and care will be taken to limit disruptions. Work will be performed under strict infection control guidelines to ensure the safety of patients and staff. The Contractor will be responsible for and should be experienced with the implementation of infection control requirements, interim life safety measures, constructing and maintaining required barriers, coordinating shutdowns, maintaining a clean and organized job site and generally with performing construction in a functioning Hospital. | ||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |