Similar Projects
New Acquisition PCT 3
Infrastructure
Post-Bid
Helena, MT

USFS Region One Timber Stand Improvement and Hand Fuels Treatments
Term Contract
Post-Bid

River Junction FAS Forestry Project
Infrastructure
Results
Helena, MT

Phase 1 Distribution System Improvements
Alteration
Post-Bid
Big Timber, MT

Lone Peak High School - Phase 2 Addition And Renovation - Bid Package #2
Renovation, Term Contract, Infrastructure, Alteration
Post-Bid
Gallatin Gateway, MT

The Tree and Shrub Clearing, Removal and Disposal May be Located Adjacent to NHS Interstate
Infrastructure
Post-Bid
MT

Last Updated 03/30/2022 03:28 PM
Project Title

Lolo, Bitterroot and Flathead National Forest Roadside Brushing

Physical Address View project details and contacts
City, State (County) Darby, Trout Creek, MT 59874 (Flathead, Ravalli, Sanders Counties)
Category(s) Heavy and Highway
Sub-Category(s) Landscaping
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Roadside Brushing for the Lolo, BItterroot and Flathead National Forests located within Region One of the US Forest Service.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Utility Water Drains, Utility Area Drains, Catchbasins.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents