Similar Projects
Jesuit Academy Expansion
New Construction, Addition, Demolition, Alteration - 50,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Chicago, IL 60644

Reconstruct Existing Lane Confirguration
Infrastructure
Bidding
Marion, IL

Construction Variable Width Paver Resurfacing
Post-Bid
Harwood Heights, IL

Central Division - Asphalt Paving Maintenance
Post-Bid

Stabilization of Dangerous Embankments at the Kickapoo State Recreation Area (SRA) Abandoned Mine Site
Results
Oakwood, IL 61858

HMA Resurfacing
Results
Less than $43,972 est. value
Georgetown, IL 61846

2021 Pavement Upgrades
Post-Bid
Malta, IL 60150

2020 TIF Resurfacing and Sauk Pointe Drive Intersection Improvements
Results
Sauk Village, IL 60411

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

Crack and Joint Sealing
Results
Orland Park, IL

FY 21/22 Asphalt Street Resurfacing Program
Post-Bid
Northbrook, IL

District 7 Pavement Marking Rehabilitation
Results

Construction Variable Width Pavement
Post-Bid
Joliet, IL

2020 Crack Filling Program
Results
Less than $20,000 est. value
Indian Head Park, IL 60525

Lincoln Yards South Package A-1 & B
Post-Bid
Chicago, IL 60632

Last Updated 01/07/2022 09:17 AM
Project Title

RR-21-4821 Pavement Repairs

Physical Address View project details and contacts
City, State (County) State-Wide: IL
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Location The improvements to be constructed under this contract shall be performed along the Tri-State Tollway (I-294) from M.P. 23.1 to M.P. 39.8 and Systemwide Intermittent concrete and asphalt pavement repairs, removal and replacement of raised pavement reflectors, longitudinal joint repairs, pavement marking, various crack cleaning and filling, crack routing and sealing and maintenance of traffic. The improvements to be constructed under this contract shall be performed along the Tri-State Tollway (I-294) from M.P. 23.1 to M.P. 39.8 and Systemwide

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents