Similar Projects
Noxubee County Library Roof and Structural Repair
Renovation
Bidding
$300,000 CJ est. value
Macon, MS 39341

Removal of Underground Storage Tanks
Infrastructure
Bidding
$500,000 CJ est. value
Gulfport, MS 39503

Supplies and Materials - Concrete Slabs, Limestone Rock
Infrastructure, Alteration
Post-Bid
MS

2022 Brandon Amphitheater Concrete Repair Project
Alteration
Post-Bid
Brandon, MS 39042

Humphrey High School Athletic Complex - Rebid
Renovation
Results
$2,499,000 CJ est. value
Belzoni, MS 39038

Monroe County School District, Hamilton School Cafeteria Addition
Addition, Demolition, Infrastructure
Results
$698,787 CJ est. value
Hamilton, MS 39746

Thacker Loop Sidewalk Improvements
Infrastructure
Bidding
$300,000 CJ est. value
Oxford, MS 38655

Annual Contract for Concrete Pilings
Term Contract
Post-Bid
MS

New Sanitary Sewer Force Main, Pump Station Rehabilitation
Renovation, Infrastructure
Results
$348,550 CJ est. value
Lake, MS 39092

Demolition of Concrete Canopies
Demolition, Infrastructure
Post-Bid
$500,000 CJ est. value
Gautier, MS 39553

2021 SRF Wastewater Improvements
Renovation
Results
$1,766,420 CJ est. value
Magnolia, MS 39652

Ramp and Parking Improvements
Infrastructure
Post-Bid
$500,000 CJ est. value
Waynesboro, MS 39367

Pre-Plan Criminal Justice Renovations
Renovation
Results
$14,496,000 CJ est. value
Hattiesburg, MS 39406

BancorpSouth Arena Polished Concrete Finishing
Alteration
Post-Bid
$250,000 est. value
Tupelo, MS 38804

Bridge Replacement at Old Highway 80 Over Okatibbee Creek
Demolition, New Construction, Infrastructure
Results
$3,357,356 CJ est. value
Forest, MS 39074

Last Updated 06/08/2023 03:03 AM
Project Title

Horn Lake Elementary School HVAC Replacement

Physical Address View project details and contacts
City, State (County) Horn Lake, MS 38637   (DeSoto County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $370,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Owner reserves the right to reject any and all bids on any or all projects and to waive informalities. The project consists of replacing approximately 38 existing mechanical split units which includes furnaces, condensers, and heat pumps. Work will also include all associated plumbing and electrical work. Proposals shall be submitted on proposal forms provided with the specifications and must be accompanied by Proposal Security in the form of Certified Check or acceptable Bid Bond in the amount equal to at least five percent (5%) of the Base Bid: such security to be forfeited as liquidated damages, not penalty, by any bidder who fails to carry out the terms of the proposal, execute contract and post Performance Bond in the form and amount within the time specified. The Bid Bond, if used, shall be payable to the Owner Project Location: 6341 Ridgewood Rd, Horn Lake, MS 38637 Owner: Desoto County School District, 5 East South Street, Hernando, MS 38632

Details

48,405 SF.
Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents