Similar Projects
Last Updated | 02/08/2023 12:34 AM |
Project Title | SR 435 over Interstate 84 |
Physical Address | View project details and contacts |
City, State (County) | Moscow, PA 18444 (Lackawanna County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge, Paving/Reconstruction, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Contract Award, Construction start expected February 2023 |
Bids Due | View project details and contacts |
Estimated Value | $9,206,039 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | For the rehabilitation and improvement of a certain section of STATE HIGHWAY in LACKAWANNA COUNTY, Scott Township, Roaring Brook Township, Commonwealth of Pennsylvania, STATE ROUTE 0435, SECTION 250. The proposed project includes the replacement of the existing bridge carrying S.R. 0435 over Interstate 84. The existing bridges are two-span steel plate girders with reinforced concrete abutments/pier perched on rock. The proposed replacement bridges will be two-span prestressed concrete PA Bulb Tee beams using similar substructures and foundations. Full depth roadway reconstruction will extend approximately 50 feet from each end of the bridge. New guide rail, pavement markings, and signing will also be installed. The proposed project will also include the removal of an existing structure mounted sign that is currently located on the existing S.R. 0435 bridge and a new monopipe frame sign structure will be constructed. During construction, SR 0435 traffic will be controlled by using single lane bi-directional crossovers, which will allow each bound to be reconstructed full width. Jug Handle Road will remain open throughout construction. Temporary long-term lane shifts on I-84 (protected by temporary barrier) will be necessary to construct the bridge replacement. Temporary single lane closures on I-84 are also expected to construct the new sign structure. Temporary traffic patterns will have speed reductions through the work zone but will not have any weight or width restrictions. All work with a total project length of 2713 linear feet (0.514 miles), all as indicated on the approved drawings included in the bid package. Project Cost Range: $7,500,000.00 - $9,999,999.99 Federal Project Status: PENNDOT Oversight NHS Structure Work: 73.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: BRIDGE 408 Version: 2020-5 PADOT - GRP 111-23-7135-1 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |