Similar Projects
Water Main Rehabilitation And Replacement - WD25UT01 - City of Napa
Infrastructure
Conception
$400,000 est. value
Napa, CA 94558

Water Main Rehabilitation And Replacement - WD25UT01 - City of Napa
Infrastructure
Conception
$400,000 est. value
Napa, CA 94558

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

MT 3023 Measure T Street Rehabilitation at Various Locations
Infrastructure
Bidding
$285,000 est. value
Yountville, CA

MT 3023 Measure T Street Rehabilitation at Various Locations
Infrastructure
Bidding
$285,000 est. value
Yountville, CA

Imola Ave and SR-29 Express Bus Improvements Project
Infrastructure
Post-Bid
$2,600,000 est. value
Napa, CA 94559

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Renovation of the Existing Underground Steam Distribution System
Infrastructure
Results
$13,222,600 est. value
Yountville, CA 94599

Silverado Trail Phase L Paving
Infrastructure
Results
$1,400,000 est. value
Napa, CA 94558

Coombs Street Water Main Upgrade Fifth to Ash - WD24UT05 - City of Napa
Infrastructure
Conception
$300,000 est. value
Napa, CA 94559

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

Cold Plane AC, Place HMA (TYPE A) and RHMA-G
Infrastructure
Results
$8,600,000 est. value
CA

Lincoln Ave Rehabilitation - California To Silverado - City Of Napa
Alteration
Conception
$2,500,000 est. value
Napa, CA 94559

NVTA Sheehy Court 36-Inch Replacement Project
Infrastructure
Post-Bid
$400,000 est. value
Napa, CA 94558

Napa Valley Vine Trail - Street Helena to Calistoga
Infrastructure
Results
$9,500,000 est. value
Calistoga, Saint Helena, CA 94574

Reported 06/22/2022 03:07 PM
Project Title

Imola Avenue Rehabilitation - Soscol to East End - ST22PW07 - City of Napa

Physical Address View project details and contacts
City, State (County) Napa, CA 94558   (Napa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2027
Bids Due View project details and contacts
Estimated Value Less than $2,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Roadway rehabilitation including pavement and striping work, possible concrete and storm drain improvements. As of June 21, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2026. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2026. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents