Similar Projects
SR 291 Drainage Improvement
Alteration
Design
$1,627,000 est. value
Eddystone, PA 19022

Pugh Road Culvert Replacement Project
Infrastructure
Bidding
$300,000 est. value
Wayne, PA 19087

Storm Water Improvements at Smedley Park
Infrastructure
Bidding
$700,000 est. value
Springfield, PA 19064

Furnish and Deliver Catch Basin Inlet Boxes
Term Contract
Post-Bid
Media, PA

Extension of 40 Feet of Storm Sewer
Infrastructure
Post-Bid
Chester Heights, PA 19342

State Game Lands #183 Shooting Range Improvements
Results
Palmyra, PA

Concord Square Park Stormwater Management Improvements
Results
Aston, PA 19014

Delmar Drive Stormwater Replacement Project
Infrastructure
Bidding
$200,000 est. value
Folcroft, PA 19032

RFI - Monongahela River, Lock and Dam 3 Decommissioning
Renovation
Post-Bid

Whiteley Road Culvert Replacement
Results
Brookhaven, PA 19015

Echo Valley Culvert Improvements
Infrastructure
Bidding
$300,000 est. value
Newtown Square, PA

MS4 Grant Storm Water BMP Improvements
Infrastructure
Post-Bid
Newtown Square, PA

West Rolling Road Basin Retrofit
Results
Springfield, PA 19064

Stormwater Water Quality Improvements
Infrastructure
Post-Bid
Millbourne, PA 19082

Storm Drainage Improvements - Carre Avenue
Results
Less than $81,000 est. value
Tinicum Township, PA 19029

Last Updated 07/12/2022 11:34 AM
Project Title

Sunny Brae Basin Rehabilitation

Physical Address View project details and contacts
City, State (County) Media, PA 19063   (Delaware County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Dam/Tunnel, Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes but is not limited to survey stake-out, removal of large existing trees and vegetation, removal and replacement of deteriorated storm sewer pipe and structures, establishment of temporary equipment and material staging areas, installation of temporary construction fence, installation of temporary and permanent storm sewer bypass piping, installation of temporary dewatering pits, pumps and coffer dams, removal and disposal of existing basin berm material, import and installation of new basin berm cutoff trench and clay core, bulk earthwork, soil compaction testing, installation of erosion and sedimentation controls, installation of basin outfall control structure and outfall pipe, installation of modified concrete end walls, installation of basin forebay, drainage swales, 8-inch underdrain, and wetland channel and pockets, installation of wet-tolerant seed and landscape plantings, finish grading, seeding and stabilization, replacement of stockade and shadow box fence, installation of post and rail fence with wire mesh and access gates and preparation of survey as-built plan of completed work.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Erosion and Sedimentation Controls, Shoring.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents