Similar Projects
Lakeside At Trappe Master Plan
New Construction
Design
Trappe, MD

WRTP Launder Cover Design
Bidding
Chesapeake Beach, MD 20732

Stevensville Water Treatment Plant
New Construction
Bidding by Invitation
Stevensville, MD 21666

Water Treatment Program
Post-Bid
Princess Anne, MD 21853

Solids Screening at Four Water Resource Recovery Facilities Project
Post-Bid
Damascus, MD

Fair Hill Water System Upgrade
Renovation
Results
Elkton, MD

Water Treatment Services
Term Contract
Results
$13,530 est. value
Kensington, MD 20895

Repair of Steam Sterilization Plant, Fort Detrick, MD
Post-Bid
$25,000,000 to $100,000,000 est. value
Fort Detrick, MD

Fruitland Water System Upgrade - Supply Well and Water Treatment Plant
Results
Fruitland, MD 21826

Patuxent Water Filtration Plant Centrifuge Control Room
Post-Bid
Laurel, MD 20707

Water Treatment Services – Maintenance, Repair and Installation
Results
Annapolis, MD 21401

Water Treatment Service Contract
Post-Bid
College Park, MD 20742

Charlotte Hall Veteran's Home Wastewater Treatment Plant Upgrade Phase II Saint Mary`S County, Maryland
Results
Charlotte Hall, MD 20622

Post-Hypochlorite and Fluoride Monitoring Annapolis Water Treatment Plant
Post-Bid
Annapolis, MD 21401

Broadwater WRF Dewatering Facility Polymer Replacement
Results
$500,000 to $1,000,000 est. value
Churchton, MD 20733

Last Updated 08/25/2020 12:10 PM
Project Title

Cox Creek DMCF Concrete Pole Installation and Aggregator Pole Relocation

Physical Address View project details and contacts
City, State (County) Orchard Beach, MD 21226   (Anne Arundel County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish of all materials and equipment and the performing of all labor to complete the construction related to the new Cox Creek DMCF Concrete Pole Installation and Aggregator Pole Relocation project.

Details

Division 01 - General Requirements.
Division 03 - Concrete, Cast-in-Place Concrete, Miscellaneous Cast-in-Place Concrete.
Division 26 - Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Utility Poles for Electrical Systems.
Division 31 - Earthwork, Bored Piles, Drilled Caissons.
Division 33 - Utilities, Water Utility Storage Tanks, Aboveground Water Utility Storage Tanks, Prestressed Concrete Aboveground Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents