Similar Projects
New Transit Facility - Tahoe Transportation District
New Construction, Infrastructure
Conception
$88,000,000 CJ est. value
Carson City, NV 89701

New Transit Facility - Tahoe Transportation District
New Construction, Infrastructure
Conception
$88,000,000 CJ est. value
Carson City, NV 89701

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Mills Park Maintenance Shop
New Construction, Infrastructure
Bidding
$443,055 CJ est. value
Carson City, NV 89701

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

ADA Upgrades, Warm Springs Correctional Center
Infrastructure
Post-Bid
$490,000 est. value
Carson City, NV 89701

NV Flap 39(1) Kings Canyon Road
Results
$2,000,000 to $5,000,000 est. value
Carson City, NV 89703

All Season Cold Patch
Infrastructure
Results
Carson City, NV

Silver View Townhomes
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Carson City, NV 89701

Advocates to End Domestic Violence Apartment Building
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Carson City, NV 89701

Highway Improvement
Infrastructure
Bidding
Carson City, NV 89701

East Park Street Utility Improvement Project
Infrastructure, Alteration
Post-Bid
$200,000 est. value
Carson City, NV 89706

Highway 50 East Water Main Replacement Project
Infrastructure
Results
$279,000 est. value
Carson City, NV 90745

North Carson Street Multi Residential Development
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Carson City, NV 89706

CDBG ADA Improvements Project
Infrastructure
Bidding
$304,173 CJ est. value
Carson City, NV 89701

Last Updated 03/15/2023 02:05 PM
Project Title

Diversion Dam Controls Upgrade (MLWS)

Physical Address View project details and contacts
City, State (County) Carson City, NV 89703   (Carson City County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Dam/Tunnel, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $928,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Site Directions: Marlette Lake Water System, Diversion Dam Online Bidding: Available Base Bid Description: New Pipe, valves, vaults, controls, fencing, and walkway per plans and specifications. Bid Bond: 5% Performance Bond: 100% Payment Bond: 100% Contract Time: 74 calendar days. Liquidated Damages: $650.00 per day. Prevailing Wages must be paid on this project.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Earthwork Methods, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents