Similar Projects
Reported | 03/16/2022 12:00 AM |
Project Title | FCI Estill - Replace Roofs (Tornado) |
Physical Address | View project details and contacts |
City, State (County) | Estill, SC 29918 (Hampton County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids. |
Project Status | Accepting Letters of Interest |
Bids Due | View project details and contacts |
Estimated Value | Greater than $10,000,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists of furnishing all equipment, materials and labor for the complete construction of the work. Complete roof replacement for the buildings located in the area of work identified as shown on the drawings. Scope of work includes demolition of existing low-slope roof membrane and steep-slope metal roof systems, existing skylight units and existing roof access hatch, down to the existing roof deck (OSB sheathing, plywood sheathing, or metal roof deck) or open steel framing where occurs. Demolition of low-slope roofs includes existing roof membrane, membrane flashing, parapet substrate, primary and overflow roof drains, scuppers, wood blocking, parapet coping, skylight units, roof access hatches, metal roof panels, continuous rib purlins and clips, underlayment, rigid roofing insulation, metal flashing, gutters, downspouts, roof transitions, trim and other related components associated with the existing roofing assemblies. Demolition of steep-slope roofs includes existing metal roof panels, continuous rib purlins and clips, underlayment, rigid roofing insulation, metal flashing, gutters, downspouts, roof transitions, trim and other related components associated with the existing roofing assemblies. Install new membrane roof assembly including fully-adhered TPO roof membrane, rigid roof insulation board, primary and overflow roof drains tied into existing roof drain leaders, through wall scuppers, parapet membrane flashing over new parapet substrate, fabricated parapet coping, skylight units, roof access hatches, pressure treated wood blocking, roof curbs, metal flashing, transitions, trim and other related components to achieve a complete warranted, weathertight enclosure and roof storm drainage system. Install new metal roofing assembly including standing seam metal roof panels with continuous zee-rib purlins, underlayment, rigid roof insulation board where applicable, metal flashing, gutters, downspouts, transitions, trim and other related components to achieve a complete warranted, weathertight enclosure and storm drainage steep-slope roof system. Work includes removal and replacement of vertical exterior wall elements (metal wall panels, sub-framing, trim, flashing, transitions and other related components) associated with the vertical building enclosure where identified on buildings S, T, U and OW. Remove and replace existing roof mounted units and penetrations as scheduled. Other work indicated in the contract documents includes install new roof top mounted units and lightning protection system. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |