Similar Projects
Address Pavement Condition of PCC Pavement on I-24 Both Direction(S)
Infrastructure
Conception
$6,500,000 CJ est. value
Hopkinsville, KY 42240

Address Pavement Condition of PCC Pavement on I-24 Both Direction(S)
Infrastructure
Conception
$6,500,000 CJ est. value
Hopkinsville, KY 42240

Improve and Widen Ky 115
Infrastructure
Design
$2,020,000 CJ est. value
Pembroke, KY 42266

Improve and Widen Ky 115
Infrastructure
Design
$2,020,000 CJ est. value
Pembroke, KY 42266

Competition Baseball & Softball Field
Infrastructure
Bidding
$5,000,000 CJ est. value
Fort Campbell, KY 42223

Competition Baseball & Softball Field
Infrastructure
Bidding
$5,000,000 CJ est. value
Fort Campbell, KY 42223

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

New Consolidated High School - Mass Grading
Renovation, Infrastructure
Post-Bid
Hopkinsville, KY 42240

Mike Foster Way COnnector Road
Infrastructure
Results
$175,000 to $225,000 est. value
Hopkinsville, KY

Cadiz to Russellville Road (US 68) - Asphalt Resurfacing
Infrastructure
Results
KY

New Hammond Heights Community Renovation
Renovation, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Fort Campbell, KY 42223

Apex 1
New Construction, Infrastructure - 450,000 SF
Pending Verification
$310,000,000 CJ est. value
Hopkinsville, KY 42240

Address Pavement Condition of Edward T. Breathitt Pennyrile Parkway Both Direction(S)
Infrastructure
Conception
$1,750,000 CJ est. value
Hopkinsville, KY 42240

Competition Soccer Field Improvements
Infrastructure
Bidding
$5,000,000 CJ est. value
Fort Campbell, KY 42223

Hopkinsville-Christian County Academy
New Construction, Infrastructure
Post-Bid
$39,000,000 CJ est. value
Hopkinsville, KY 42240

Last Updated 07/06/2023 09:18 AM
Project Title

Fort Campbell Construction, Repair, Restoration and Rehabilitation of Roadways and Hardstands

Physical Address View project details and contacts
City, State (County) Fort Campbell, KY 42223   (Christian County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $100,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of July 6, 2023, this project has not yet been awarded. A timeline for award has not yet been established. 1. Action Code: N/A 2. Date: 5/5/2023 3. Year: 2023 4. Contracting Office Zip Code: 42223 5. Product or Service Code: Z2LB - Repair or Alteration of Highways/Roads/Streets/Bridges/Railways 6. Contracting Office Address: MICC Fort Campbell, Bldg. 6923 38th and Desert Storm Avenue, Fort Campbell, KY 42223 7. Proposed Solicitation Number: W91248-23-B-0001 8. Closing Date: 5 June 2023 at 2:00 PM CT 9. Question Due Date: All questions are due by 17 May 2023 at 2:00 PM CT 10. Contracting Officer: Eric C. Boston 11 Solicitation Number: W91248-23-B-0001 12. Contract Award Dollar Amount: $100,000,000.00 (Ceiling) 13. Line item Number: Contract Line Item Numbers (CLINs) shall be 0001. 14. Contract Award Date: TBD 15. Contractor: TBD 16. Description: Mission and Installation Contracting Command - Fort Campbell intends to award a paving Single Indefinite Delivery/Indefinite Quantity (IDIQ) contract at Fort Campbell, KY with a performance period of one (1) base year plus four (4) options years. This is a combined synopsis/solicitation notice for an installation wide paving repair, replacement, and minor construction of pavements including roads, housing area streets, parking lots, and airfield pavements at Fort Campbell, KY. This acquisition is a 100% small business set-aside. The North American Industry Classification System (NAICS) code for this acquisition is 237310 with a size standard of $45,000,000.00 in annual revenue. The estimated magnitude of this project is between $25,000,000.00 and $100,000,000.00. Task orders will be written against the base year and the four (4) additional ordering period years. The contractor shall provide all supervision, personnel, equipment, tools, transportation, materials, and supplies to performing installation wide paving repair, replacement, and minor construction of pavements including roads, housing area streets, parking lots, shoulders (including all associated site work and appurtenances such as curbs, gutters and sidewalks), runways, taxiways, and airfield pavements at Fort Campbell, KY. The specific description of work will be identified in each individual task order. All work shall be performed in accordance with all applicable federal, state, and local rules/laws, to achieve and maintain economical, safe, sanitary, operational and undeteriorated conditions. Fort Campbell, KY covers the states of Tennessee and Kentucky and consists of the following counties: Montgomery and Stewart County, TN and Christian and Trigg County, KY. The proposed contract award date is 27 July 2023 or sooner with a proposed contract start date of 27 July 2023 or sooner. Contractors submitting a bid must have a Cage Code and be registered in the System of Award Management (SAM) at https://www.sam.gov. Registration requires applicants to have a Unique Entity ID number. All inquiries during this solicitation phase should be directed to the Contract Specialist, Aaron Davis at aaron.l.davis30.civ@army.mil and courtesy copy (cc:) the Contracting Officer, Eric Boston at eric.c.boston.civ@army.mil. Vendors are requested to review this solicitation and submit only written questions and/or comments with the email subject line "W91248-22-B-0001, IDIQ Contract for Paving." 17. Place of Contract Performance: Fort Campbell, KY 42223 18. Set-aside Status: This acquisition is a 100% Small Business set-aside, pursuant to the requirements of FAR Subpart 19.5. 19. Bid Opening Information: a. Date - 6 June 2023 b. Time - 10:00 AM CT c. Location - MICC-Fort Campbell, Building 6923, Main Conference Room, 38th St. and Desert Storm Avenue, Fort Campbell, KY 42223

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents