Similar Projects
Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Taconic Furnace Maintenance and Emergency Service
Term Contract
Post-Bid

2019 - 2024 Central A/C Start-Up and Inspection Services
Term Contract
Results
Wassaic, NY 12592

2019 HVAC Maintenance and Service
Results
Poughkeepsie, NY

Dover Middle/High School Building Improvement
Post-Bid
Dover Plains, NY

HVAC Work, Replace Roof - DOT Region 8
Results
$525,000 to $1,050,000 est. value
Poughkeepsie, NY

HVAC Mini Split Units and Various HVAC Replacement Parts
Post-Bid
Poughkeepsie, NY

1995 Jail Building Rooftop Chiller Replacement
Results
Poughkeepsie, NY

HVAC Preventive Maintenance and General Repair and Emergency Service
Post-Bid
Rhinebeck, NY

IDIQ JOC HVAC Phase 2
Results
Less than $500,000 est. value

Heating Systems Service & Repair
Term Contract
Post-Bid
Poughkeepsie, NY 12601

Mid Hudson Library System Office Building 2nd Floor Air Conditioning Replacement
Results
Poughkeepsie, NY 12601

Installation of Central Air Conditioning System for Roosevelt Station
Post-Bid
Staatsburg, NY 12580

2020 Heating, Ventilation, and Air Conditioning (HVAC) Maintenance and Repairs
Term Contract
Results
Dover Plains, NY 12522

Water Cooled Vapor Compression and Vapor Absorption Chiller Preventative Maintenance and Repair Services
Term Contract
Post-Bid
Kingston, Poughkeepsie, Suffern, Valhalla, NY

Reported 06/29/2019 12:00 AM
Project Title

HVAC Upgrades

Physical Address View project details and contacts
City, State (County) Wappingers Falls, NY 12590   (Dutchess County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $400,000
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description A. The work included in this Contract is shown on the drawings and described in these specifications. It consists of furnishing all labor, material, services, supervision and connection of all systems shown and/or specified including the requirements of: DIVISION 0 - BIDDING AND CONTRACT REQUIREMENTS DIVISION 1 - GENERAL REQUIREMENTS DIVISION 26 - ELECTRICAL B. Contractor is responsible to review and understand all drawings and all work of all trades to ensure a complete and thorough project. C. Provide all labor, tools, materials, equipment, coordination, and plans necessary for installation and proper operation of the electrical systems. D. Contract drawings and specifications are complementary and must be so used to ascertain all requirements of the work.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents