Similar Projects
New Bus Garage
New Construction
Conception
$35,000,000 est. value
Indianapolis, IN

Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

Concrete Pavement Rehabilitation - Area 1
Bidding
$2,000,000 to $3,000,000 est. value
Indianapolis, IN 46204

Pedestrian Crash Focus, Area 11A in the Greenfield District
Infrastructure
Bidding
$1,420,000 est. value
Indianapolis, IN

Engineering, Planning and Development
Post-Bid

Engineering, Planning and Development
Post-Bid

Water Tank Inspections, OCONUS and CONUS
Results
$10,000 to $5,000,000 est. value

Water Tank Inspections, OCONUS and CONUS
Results
$10,000 to $5,000,000 est. value

Architect-Engineering (AE) Indefinite Delivery Contract (IDC) in Support of the Defense Health Agency (DHA) and Component Medical Commands
Post-Bid
Less than $45,000,000 est. value
Washington, DC

NGB Fire Protection - National Architect and Engineering Indefinite Delivery Indefinite Quantity Contract
Results
$70,000 to $10,000,000 est. value
Washington, DC

IN000A IUPUI Campus-Repair Tunnel Top Under Ball Gardens
Post-Bid
Indianapolis, IN 46202

National Architecture/Engineering/Interiors (IDIQ) Contract
Results
Less than $25,000,000 est. value

Construction Inspection Services
Post-Bid
Beech Grove, IN 46107

Architect-Engineer Indefinite Delivery Contract for Inland Navigation and Water Resources Planning Services Assigned to the Great Lakes and Ohio River Division
Results
Less than $15,000,000 est. value
Chicago, IL - Louisville, KY - Buffalo, NY - Pittsburgh, PA - Nashville, TN - Huntington, WV

Last Updated 07/26/2022 09:07 AM
Project Title

RFQ Design - Master Planning and Design Services for New East Campus Expansion

Physical Address View project details and contacts
City, State (County) Indianapolis, IN 46235   (Marion County)
Category(s) Heavy and Highway, Professional Services, Transportation
Sub-Category(s) Architectural, Engineering, Misc. Structures, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Request for Qualifications (RFQ) in August or September 2022 seeking master planning and design services for our new East Campus Expansion. ------ IndyGo is currently renovating two buildings at 9503 E. 33rd Street, Indianapolis to become its new Headquarters and 'East Campus.' These buildings will house IndyGo's administrative offices, a new Board room, and training spaces. Future plans for the site will require demolition of remaining buildings and constructing several new operations buildings. Needed elements include a bus storage facility, a bus maintenance facility, operator training/test track, employee parking, a potential fueling area, and other operational support structures. The upcoming RFQ will seek qualifications from Architectural and Engineering (A&E) consultants to prepare a Headquarters Master Plan containing these elements and including consideration of security access, employee and guest parking needs, ped/vehicular/bus traffic flow, estimates of energy usage for vehicle charging, and potential need for substation. Additional property acquisitions may be considered. The upcoming RFQ will seek qualifications from Architectural and Engineering (A&E) consultants to prepare a Headquarters Campus Master Plan containing these features as well as the final design of selected elements of the Plan, determined based on agency needs and availability of funds. It is anticipated that final design will be required for the new bus storage and/or maintenance facility, at a minimum. IndyGo is seeking A&E teams for this project that can demonstrate significant, proven transit and FTA grant compliance experience. Please note that the selected A&E Firm could be excluded from participating as the Construction Engineer (CE), Construction Manager (CM) and/or the Construction Manager as Constructor (CMc) for work related to the build-out of this Master Plan. This advertisement is also to notify IPTC-registered vendors of IndyGo's intent to issue a Request for Proposals (RFP) in late Q4 2022 or early 2023 for Construction Manager as Constructor (CMc) support on the new East Campus bus storage and/or maintenance facility. Please contact Dave Adamson (dadamson@indygo.net / procurement @indyGo.net) The method of Contractor Selection has not been Determined at this time

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Protective Covers, Transportation Stop Shelters.
Division 12 - Furnishings, Multiple Seating, Pews and Benches, Benches.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents