Similar Projects
Middlesboro Channel Clearing
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Middlesboro, KY 40965

Invicta Drive Drainage Improvement
Bidding
$180,000 to $225,000 est. value
Louisville, KY 40216

Nelson Thompson Slide and Drainage AML
Infrastructure
Bidding
$129,760 est. value
Webbville, KY 41180

Shoreline Erosion Control Green River Lock and Dam #1
Post-Bid
$25,000 to $100,000 est. value
Reed, KY

Buffalo Lake Restoration
Post-Bid
Elizabethtown, KY

Proposals Recommending Culvert Repair or Replacement Solutions for Culverts at Aj Jolly Park
Results
Less than $98,000 est. value
Newport, KY

Grandview Stabilization
Results
Newport, KY

Carrollton Utilities - CU 2020 Gas Expansion
Infrastructure
Bidding
Carrollton, KY

Middlesboro, KY Channel Clearing
Post-Bid
$1,000,000 to $5,000,000 est. value
Middlesborough, KY

Rust Drive Bridge Erosion Remediation
Results
Less than $22,500 est. value
Taylor Mill, KY

8018 South Third Street Road - Drainage Improvement and Building Underpinning
Post-Bid
Louisville, KY 40214

Concrete Retaining Wall
Results
Burlington, KY

PreQualifications for Crescent Hill Discharge System Improvements
Post-Bid
Louisville, KY

Culvert Pipe
Results
KY

Drainage Improvement
Term Contract
Post-Bid
Crestwood, KY

Last Updated 07/30/2021 06:50 AM
Project Title

Scott Fleming AML

Physical Address View project details and contacts
City, State (County) KY   (Letcher County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $42,320
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To arrive at this site in Letcher County, from the intersection of KY15 and US119 in Whitesburg, continue on US119 north for 10.9 miles and make a slight right onto US119 /US23 north and continue 0.2 miles to Jenkins, KY. Turn right at the 1st cross street onto C&O Railroad Road and go 1.3 miles. Turn right onto KY 805 E/HWY 805/S Main Street and continue 3.4 mile. Turn left onto McPeaks Branch Road and go 0.9 miles to the project site on the left (817 McPeaks Branch). There exists a slide directly behind the home at 817 McPeaks Branch Road. This is the slide appears to be linked to previous mining in the Upper Elkhorn #3 coal bed. The slide material is to be excavated and replaced with Class III Backfill. The excavated material will be placed in the vacant lot located beside Mrs. Fleming. This is Scott Fleming's property and remnants of a burned out home remain there as well as two out buildings. The two small buildings are to be removed by the property owner but not replaced by AML. A subdrain will be constructed along the base of the of the slide and discharged into the drainage channel in the front of the house.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents