Similar Projects
Deer Prairie Creek Preserve American Disabilities Act (Ada) Site Improvements
New Construction, Infrastructure, Alteration
Bidding
FL

Trout Creek Decking and Railing Replacement
Infrastructure
Bidding
Thonotosassa, FL 33592

Design-Build Floating Day Dock and Dinghy Dock
Post-Bid
Bradenton Beach, FL 34217

Martin County Bs/Mpz Marker Construction Project
Post-Bid
Jensen Beach, Stuart, FL

NAVFAC Destroyer Slip South Quay Wall Restoration
Results
$10,000,000 to $25,000,000 est. value
Mayport, FL 32228

Wharf and Wall Repairs
Results
$1,677,491 est. value
Palmetto, FL 34221

Tribute by Marriott
New Construction
Construction
$12,000,000 est. value
Saint Augustine, FL 32080

Latitude Margaritaville Watersound Amenities, Phase 1 & 2
New Construction - 34,862 SF
Construction
$30,000,000 est. value
WaterSound, FL

Floating Kayak Launch System ADA Compliant
Infrastructure
Bidding
Milton, FL

Fishing Piers, Rebuild With Forever Plastic Materials
Infrastructure
Post-Bid
Port Saint Lucie, FL

Beach Walkover Restoration Project
Results
$108,009 est. value
Belleair Beach, FL 33786

Bay Point Marina
New Construction, Infrastructure
Construction
$10,000,000 est. value
Panama City, FL

Boathouse & Bulkhead Replacement
Alteration
Bidding
$1,000,000 to $5,000,000 est. value
FL

Construction of The New Boardwalk and Dock at The St. Petersburg College Campus in Bay Pines
Infrastructure, Alteration
Post-Bid
Madeira Beach, FL 33708

Construction Management at Risk Services for Kingfish Boat Ramp Improvements
Results
Less than $4,500,000 est. value
Holmes Beach, FL 34217

Last Updated 04/11/2022 04:59 AM
Project Title

Howey Pier Project

Physical Address View project details and contacts
City, State (County) Howey in the Hills, FL   (Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Deck replacement on the town fishing Pier, which is approximately 165 ft. long by 16 ft wide. The Pier will need to be field measured by contractor to verify exact dimensions. The Pier is located at Griffin Stormwater Park in Howey in the Hills. The work will include the removal, disposal, and replacement of the existing wood walk boards, matching existing size and thickness using similar 2” x 6” marine grade #1 pressure treated decking lumber fastened to the existing 1/4” thick gal-aluminum structure with 2.5”, #10, high resistance #304 stainless steel fasteners. The work will also include the removal, disposal and replacement of the existing wood 2” x 6” midrail and existing wood 2” x 8” handrail top cap to include all horizontal 2” x 6” stringers using similar 2” x 6” and 2” x 8” marine grade #1 pressure treated lumber fastened to the existing 4” x 6” wood support post with 3”, #10, high-resistance fasteners. The top rail will have 45-degree splices and must be rounded with no splinters.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents