Similar Projects
Sewer Improvements - County of Lake
Infrastructure
Conception
$25,000,000 est. value
Crown Point, IN

Wastewater Treatment Plant Expansion - River Ridge Development Authority
Infrastructure
Conception
$40,000,000 est. value
Jeffersonville, IN 47130

Liberty Park Pipe Lining, Crown Point
Infrastructure
Design
$5,000,000 est. value
Crown Point, IN

Independence Hill Conservancy District Sanitary Sewer Lateral Pipelining, Merrillville
Infrastructure
Design
$5,000,000 est. value
Merrillville, IN

Wayne Prep and Chapelwood Site Package
Infrastructure
Bidding
$1,000,000 est. value
Indianapolis, IN

Rushville Fire Department Addition and Renovation
Addition, Demolition, Renovation, Infrastructure - 5,137 SF
Bidding
$1,000,000 CJ est. value
Rushville, IN 46173

Crew Carwash / McCordsville
New Construction, Infrastructure - 5,345 SF
Sub-Bidding
$700,000 CJ est. value
McCordsville, IN 46055

Utica Estates Developer RFP
Post-Bid
Utica, IN

Water Utility Improvements
Post-Bid
Gaston, IN

Jefferson Street Water Main Improvements
Results
Huntington, IN 46750

River Ridge Elevated Water Storage Tanks
Results
Jeffersonville, IN 47130

2022-1 CCMG Paving Projects
Infrastructure
Construction
$6,000,000 CJ est. value
Cannelton, IN 47520

Rehabilitate Runway - City of Elkhart
Infrastructure
Design
$250,000 est. value
Elkhart, IN 46514

Airport Snow Removal Equipment (SRE) Storage and Maintenance (MX) Facility and Associated Site Improvements
New Construction, Infrastructure - 42,000 SF
Bidding
$7,500,000 CJ est. value
Evansville, IN 47725

Site Improvements at the New Bartholomew County Landfill
Post-Bid
IN

Last Updated 07/25/2022 12:38 PM
Project Title

BL000A Domestic Water Main Replacement (Woodlawn Field)

Physical Address View project details and contacts
City, State (County) Bloomington, IN 47405   (Monroe County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $403,250 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor's written drug testing program, which must be in full compliance with IC 4-13-18. Should a successful Bidder withdraw their bid, or fail to execute a satisfactory Contract within ten days after notice of acceptance of bid, the Owner may declare the Bid Security forfeited as liquidated damages, not as penalty.Bid security for 5% of the total bid The Owner reserves the right to accept or reject any bid and to waive any irregularities in bidding. The Owner may consider a bid to be incomplete if it does not provide the required documentation as described in this Notice, including but not limited to the Minority, Women's and Veteran's Business Enterprise Participation Plan. The Base Bid may be held for a period not to exceed sixty days before awarding Contracts. All Alternate Bids may be held for a period not to exceed ninety days before award and incorporation into the contract by proper Change Directive. Questions must be submitted by 5:00 PM (local time) on Weds May 25, 2022.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents