Similar Projects
I-5/179th Street Interchange - Interchange Improvements
Infrastructure
Conception
$42,000,000 est. value
Tacoma, WA 98417

US 97/SR 22 Intersection - Upgrade Signal and Illumination
Infrastructure
Conception
Less than $1,284,000 est. value
Toppenish, WA 98948

Rainforest Trailhead Comfort Station Replacement
New Construction, Demolition, Infrastructure
Design
$250,000 to $500,000 est. value
Quinault, WA

D/B - Laurier Land Port of Entry - Concrete, Paving, Painting
Infrastructure
Design
$1,000,000 est. value
Laurier, WA

Madison District Green Infrastructure
Infrastructure
Bidding
$10,500,000 to $11,500,000 est. value
Tacoma, WA

2021 Residential Grind and Overlay - North
Infrastructure
Bidding
$400,000 est. value
Spokane, WA

N 6th St/ N 8th St Concrete Pavement Repair Project
Infrastructure
Post-Bid
Washougal, WA 98671

Asphalt Crushing Services
Infrastructure
Post-Bid
Longview, WA

SR 14, I-205 to SE 164th Avenue Auxiliary Lanes
Infrastructure
Results
$20,000,000 est. value
WA

164th Street SW Transmission Main Connection
Infrastructure
Results
$10,000,000 to $12,000,000 est. value
WA

152nd Main Street Improvements
Infrastructure
Bidding
$4,670,000 to $5,160,000 est. value
Redmond, WA 98052

Metzger Road Project CRP
Infrastructure
Post-Bid
Carson, WA 98610

Sequim-Dungeness Way and Woodcock Road
Infrastructure
Results
$900,000 to $1,000,000 est. value
Sequim, WA 98382

Abbott Road
Infrastructure
Bidding
$475,000 est. value
Walla Walla, WA 99362

SR 224 Van Giesen Improvement Phase One
Infrastructure
Post-Bid
West Richland, WA

Last Updated 07/11/2022 11:50 PM
Project Title

SR 10 et al, Kittitas and Yakima Co and SE WA Centerline Rumble Strip

Physical Address View project details and contacts
City, State (County) Cle Elum, WA   (Kittitas County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,250,000 to $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a road / highway in Cle Elum, Washington. Completed plans call for site work for a road / highway. Installation of concrete shoulder rumble strips, shoulder and centerline rumble strips, commercial HMA, pavement repair excavation, longitudinal joint seal, fog seal, pavement marking, traffic control and other work. Involves 22 items and 60 working days. Work class 1 & 4 or 12 & 47. County King County Kittitas County Yakima County Benton County Franklin County Whitman County Walla Walla County Asotin County Estimated value 1,250,000 - $1,500,000 WSDOT - SR 10 et al, Kittitas and Yakima Co and SE WA Centerline Rumble Strip *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents