Similar Projects
Reported | 02/28/2020 12:00 AM |
Project Title | Region 4 Project Specific SH 59 Seibert to Cope Construction Management, Construction Inspection and Materials Testing Engineering Services |
Physical Address | View project details and contacts |
City, State (County) | (Boulder, Cheyenne, Elbert, Kit Carson, Larimer, Lincoln, Logan, Morgan, Phillips, Sedgwick, Washington, Weld, Yuma Counties) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering, Inspection Services |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFP) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists of 26.1 miles of Hot Mix Asphalt (HMA) overlay. This HMA resurfacing project (Site #1) consists of overlaying the existing roadway with 2.5” of HMA from MP 41.07 to MP 59.5 and from MP 59.5 to MP 67.14 applying a 2” HMA leveling course followed by a 2.5” HMA final overlay. In addition, various structure rehabilitation work will be performed on structures G-25-F, G-25-C, G-25-G & G-25-H, this will also include, bridge rail, guardrail, signing, delineators and striping and scour critical work at G-25-F. Site #2 will consist of HMA patching various degraded areas between Kit Carson (MP 0.00) and Seibert (MP 41.07) |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |