Similar Projects
Last Updated | 10/05/2023 10:08 AM |
Project Title | Replace LED Light Pole Heads |
Physical Address | View project details and contacts |
City, State (County) | McDonough, GA 30252 (Henry County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected September 2023 |
Bids Due | View project details and contacts |
Estimated Value | $125,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Reference Number 0000328243 Henry County Water Authority, hereafter HCWA, is soliciting competitive bids from qualified Electrical Contractors to submit a proposal to furnish all labor, material, tools, equipment, transportation, insurance, and incidental in performing all operations in connection with Demo and Replace 14 LED Heads on light poles at HCWA's East Lake Facility. Delivery Point 1013 East Lake Road Question Acceptance Deadline 09/15/2023 05:00 PM EDT Questions are submitted online Yes Please direct all questions regarding this ITB to Gene Smith, Purchasing Agent through electronically. The Contractor shall furnish all labor, material, tools, equipment, transportation, insurance, and incidental in performing all operations in connection with replacing outdoor lighting at HCWA's East Lake Facility, as specified herein. The scope of work in this section includes, but is not limited to, the following: Contractor shall, Demo, two (2) existing single pole heads, and six (6) double pole light heads. Contractor shall, Furnish and Install only ASD Flood Light to be consistent with others. Contractor shall, Furnish and Install two (2) 185 Watt ASD LED light head on the single pole. Contractor shall, Furnish and Install two (12) 185 Watt ASD LED light head on the two head poles. Starting and completion requirements: Work shall begin under the contract within one (1) week of the date of notice to proceed. All contract work shall be completed within thirty (30) days of the purchase order unless specified otherwise |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |