Last Updated | 12/12/2022 03:10 PM |
Project Title | Phase 1A Water CIP |
Physical Address | View project details and contacts |
City, State (County) | Stockton, CA 95202 (San Joaquin County) |
Category(s) | Single Trades |
Sub-Category(s) | Plumbing |
Contracting Method | Competitive Bids |
Project Status | Construction Commenced, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $1,313,318 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | For construction of the following public work: PORT CONTRACT NUMBER 9-22-2 PORT OF STOCKTON PHASE 1A WATER CIP DESCRIPTION OF THE WORK. The project is the completion of 8 phase 1 water line on Rough and Ready Island at the Port of Stockton. There is approximately 5,760 lf of 4 wide patch back AC over installed 8 water line and additional 1,885lf, 4 wide patch back over new 8 water line for a total of 1200 tons of AC. There will be 1900 lf of new water line and 12 connections to the existing water system with pressure testing, chlorination, bacteriological testing of the new and some of the installed water lines from phase 1. Approximately one hundred feet of work on Embarcadero will be conducted in the TWIC secured facility and will require Port Escort. CONTRACT TIME. Work shall be finally completed within 154 working days from the date when Contract Time commences to run. REQUIRED CONTRACTOR S LICENSE(S). A California A Contractor License is required to Bid this Contract. Joint ventures must secure a joint venture license prior to award of this Contract. PREVAILING WAGE LAWS. The successful Bidder must comply with all prevailing wage laws applicable to the Project, and related requirements contained in the Contract Documents. INSTRUCTIONS. Bidders shall refer to Document 00200 (Instructions to Bidders) for required documents and items to be submitted in sealed envelopes for deposit at the Port of Stockton administration building lobby. SUBSTITUTION OF SECURITIES. Port will permit successful Bidder to substitute securities for retention monies withheld to ensure performance of Contract, as set forth in Document 00680 (Escrow Agreement for Security Deposits in Lieu of Retention), in accordance with California Public Contract Code, Section 22300. By this reference, Document 00680 (Escrow Agreement for Security Deposits in Lieu of Retention) is incorporated in full in this Document 00100. BID PREPARATION COST. Bidders are solely responsible for the cost of preparing their Bids. INELIGIBLE CONTRACTORS AND SUBCONTRACTORS: Port shall not accept a Bid from a Bidder who is ineligible to bid or work on, or be awarded, a public works project pursuant to California Labor Code Section 1777.1 or 1777.7. Bidder shall not include in its Bid any subcontractor who is ineligible to bid or work on, or be awarded, a public works project pursuant to California Labor Code Section 1777.1 or 1777.7. Federal ineligible listings are located on the System for Award Management (SAM) at portal. RESERVATION OF RIGHTS. Port specifically reserves the right, in its sole discretion, to reject any or all Bids, or rebid, or to waive inconsequential deviations from Bid requirements not involving time, price, or quality of the Work. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |