Similar Projects
Replacement of the Main Street Bridge over Contoocook River
Term Contract
Results
$4,900,000 to $5,400,000 est. value
Peterborough, NH

2020 Henry Bridge Road Bridge Repairs
Results
Goffstown, NH

Statewide Underwater Bridge Inspections
Post-Bid
$175,000 est. value

2020 Repairs to Bog Road Bridges
Results
Less than $152,029 est. value
Goffstown, NH

Rehabilitation of Bridge No. 102/165, Hartshorn Mill Road over Hartshorn Brook
Results
Less than $107,020 est. value
Milford, NH

Cornish Windsor Covered Bridge Scour Mitigation
Results
Less than $706,766 est. value
Cornish, Windsor, NH 03244

Address Preservation Needs on 5 Bridges in Hooksett and Manchester and over I-93 SB
Results
Less than $8,928,952 est. value
Hooksett, Manchester, NH 03106

Bridge Replacement Carrying US 202, NH 101 Over Contoocook River
Results
$8,979,713 est. value
Peterborough, NH

Preservation Reponse to Stabilize Various Bridges from Scour
Results
Less than $501,330 est. value

Dougherty Lane Bridge Repair over the Middle Branch Piscataquog River
Post-Bid
New Boston, NH

US Route 202 Reconstruction
Term Contract
Results
$4,450,000 to $4,950,000 est. value
Peterborough, NH

Queen City Bridge Rehabilitation
Results
Manchester, NH

Goffs Falls Road Bridge Replacement
Results
Manchester, NH

Canal Street Bridge Repairs - Bridge No 139/115
Results
Nashua, NH 03061

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Bidding

Last Updated 05/26/2020 10:36 AM
Project Title

Goffs Fall Bridge Replacement

Physical Address View project details and contacts
City, State (County) Manchester, NH   (Hillsborough County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,691,800
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work involves the construction of a new 24-foot span precast concrete arch with precast concrete wingwalls on precast or cast-in-place concrete pedestal walls and footings. Approximately 600 linear feet of approach work and 125 linear feet of trail construction is included.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents