Similar Projects
Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

White Pond Road Resurfacing (CH 317)
Infrastructure
Bidding
$1,085,382 est. value
OH

Four Lane Resurfacing - SUM-IR 77-15.87
Infrastructure
Bidding
$4,440,000 est. value
OH

Spot Safety - D04 PSIP Phase 2
Post-Bid
Akron, Canton, Youngstown, OH

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Post-Bid

Major Reconstruction - SR 8/IR 76/IR 77-00.63/09.74/08.42
Results
Akron, OH 44301

Hudson Aurora Road/Hudson Park Drive and SR 91/Church Street/Park Lane Crosswalk Enhancements
Results
Hudson, OH 44236

Repairs and Resurfacing Eastbound and Westbound Roadways and Repairs and Resurfacing Interchange 187 Ramps
Infrastructure
Bidding
Akron, OH

Crack and Joint Sealant (MBE Only)
Term Contract
Post-Bid

Fairlawn Corporate Parkway Extension
Results
Less than $555,000 est. value
Fairlawn, OH

Two Lane Resurfacing - SUM-SR 93/SR 162-09.10/07.26
Infrastructure
Bidding
$2,095,000 est. value
Akron, OH

Corporate Woods Circle/Boettler Road
Infrastructure
Post-Bid
$6,077,914 est. value
Green, OH 44685

2021 Asphalt Resurfacing and Patching Program
Results
$3,159,012 est. value
Hudson, OH

Intersection - SUM-Wooster Road Robinson
Infrastructure
Bidding
$1,248,937 est. value

Concrete Maintenance and Repair 2022
Infrastructure, Alteration
Post-Bid
$246,000 est. value
Tallmadge, OH

Last Updated 02/28/2022 09:29 AM
Project Title

2022 Ravenna Road Resurfacing

Physical Address View project details and contacts
City, State (County) Twinsburg, OH 44087   (Summit County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $550,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Asphalt grinding involving re-profiling to obtain minimum cross slope, resurfacing, asphalt base repairs, storm basins being adjusted or replaced and replacement of pavement markings on Ravenna Road. Project Location: Ravenna Road between East Idlewood Drive and Glenwood Drive.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents