Similar Projects
Wastewater Treatment Plant - Village of Marcellus
Renovation
Conception
$4,400,000 est. value
Marcellus, NY

Water Resource Recovery SPK41
Infrastructure
Conception
$5,300,000 CJ est. value
White Plains, NY 10601

Brookview Village - Expansion Phase III
Infrastructure
Design
$500,000 to $1,000,000 est. value
Greenfield Center, NY 12833

Gasport Sewer District 1 Wastewater Disinfection - Town Of Royalton
Renovation, Infrastructure
Design
$650,000 CJ est. value
New York, NY 10036

Onsite Wastewater Treatment Systems
Term Contract
Bidding
NY

Water Treatment Plant Upgrades - Contract 1G - General Construction
Renovation
Bidding
$600,000 CJ est. value
Niskayuna, NY 12309

Replace Wastewater Treatment Plant at Highland RC
Post-Bid
$3,325,000 to $4,650,000 est. value
Highland, NY 12528

WPCP Secondary Clarifiers
Renovation
Post-Bid
Poughkeepsie, NY 12601

Wastewater Treatment Facility at Amy Bull Crist Campus
Results
$1,000,000 to $1,200,000 est. value
Goshen, NY 10924

WWTP Upgrades Project
Results
Less than $4,000,000 est. value
Middleburgh, NY 12122

Wastewater Treatment Plant Phase I Upgrades
Construction
North Tonawanda, NY 14120

WWTF Improvements Phase 2 - General Improvements
Construction
Akron, NY 14001

Rogers Multifamily Residential
New Construction
Pending Verification
Westhampton Beach, NY 11978

WWTP Upgrade Modified SPDES - City of Kingston
Renovation
Pending Verification
$8,200,000 CJ est. value
Kingston, NY 12402

Yonkers Joint Treatment Plant Secondary System SY024
Infrastructure
Conception
$5,000,000 CJ est. value
Yonkers, NY 10701

Last Updated 10/05/2022 02:18 PM
Project Title

Blind Brook Waste Water Treatment Plant

Physical Address View project details and contacts
City, State (County) White Plains, NY 10601   (Westchester County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $3,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the replacement of roofs, installation of safety railings and repairs/replacements of expansion joints, as required, at the Blind Brook Wastewater Treatment Plant. As of October 30, 2020, the budget plan for the next fiscal year which has been formally approved by a majority vote of the County Board of Legislators. The Westchester County Board of Legislators will receive the proposed Capital Budget and the proposed Operating Budget and are charged with passing the County Budget by the end of December 2020. Information regarding design firm and general contractor selection timeline not been disclosed. A construction timeline has not been released.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents