Similar Projects
Student Athlete Performance Center
New Construction - 75,000 SF
Conception
$66,000,000 est. value
Murfreesboro, TN

Aquatics Facility
New Construction
Conception
Cookeville, TN

Dyersburg State Community College Baseball and Softball Training Facility
New Construction
Design
$1,700,000 est. value
Dyersburg, TN 38024

Vanderbilt University Athletics Facilities
New Construction, Renovation - 570,000 SF
Bidding
$300,000,000 est. value
Nashville, TN 37240

Vanderbilt University Athletics Facilities
New Construction, Renovation - 570,000 SF
Bidding
$300,000,000 est. value
Nashville, TN 37240

Crunch Fitness
Build-Out - 27,627 SF
Sub-Bidding
Chattanooga, TN 37343

Rockbridge Assisted Living
New Construction - 54,894 SF
Post-Bid
$7,000,000 to $8,000,000 est. value
Chattanooga, TN

Football Practice Facility
New Construction - 7,500 SF
Post-Bid
Selmer, TN 38375

Athletic Field House-East Ridge High School
Results
Less than $750,000 est. value
Chattanooga, TN 37412

Mynatt Park Tennis Court Resurfacing
Results
Gatlinburg, TN 37738

Alta Farms at Cane Ridge
New Construction
Construction
$34,000,000 est. value
Nashville, TN 37013

Nashville Soccer Club Training Facility
New Construction - 49,685 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Nashville, TN 37013

Bristol Motor Speedway
Renovation
Pending Verification
Bristol, TN 37620

Flatrock USA Motorsports
New Construction
Pending Verification
Westel, TN

Legacy Sports Complex
New Construction
Conception
$350,000,000 est. value
Murfreesboro, TN 37129

Last Updated 04/18/2022 10:10 AM
Project Title

Smokies Baseball Stadium

Physical Address View project details and contacts
City, State (County) Kodak, TN 37764   (Sevier County)
Category(s) Entertainment/Recreation
Sub-Category(s) Athletic Facility, Stadium
Contracting Method
Project Status Obtained from a News Source, Construction Completion Expected second quarter 2024
Bids Due View project details and contacts
Estimated Value $74,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Athletic Facility, Renovation, Stadium, Renovation.
Division 01 - General Requirements, Construction Facilities.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Painting and Coating, Painting, Special Coatings.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Interior Lighting, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Audio-Video Communications.
Division 31 - Earthwork, Site Clearing, Earth Moving, Earthwork Methods, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Athletic and Recreational Surfacing, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents