Similar Projects
Yerico Manufacturing Warehouse
New Construction, Infrastructure - 30,000 SF
Design
$2,500,000 CJ est. value
Elgin, TX 78621

Yerico Manufacturing - Manufacturing Space & Accessory Office
New Construction, Infrastructure - 20,064 SF
Design
$4,000,000 CJ est. value
Elgin, TX 78621

FM 1100 - Resurface Roadway
Infrastructure
Bidding
$394,167 CJ est. value
Elgin, TX 78621

FM 1100 - Resurface Roadway
Infrastructure
Bidding
$394,167 CJ est. value
Elgin, TX 78621

FM0535 - Seal Coat Aggregate (Material Only)
Term Contract
Sub-Bidding
$1,642,258 CJ est. value
Rosanky, TX 78953

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

2021 Group Seal Coat Program
Results

Emulsified Asphalt
Term Contract
Results
Bastrop, TX

Bastrop Rapid Express / Rapid Express Car Wash
New Construction, Infrastructure - 4,000 SF
Pending Verification
$1,500,000 CJ est. value
Bastrop, TX 78602

Bastrop Rapid Express / Rapid Express Car Wash
New Construction, Infrastructure - 4,000 SF
Pending Verification
$1,500,000 CJ est. value
Bastrop, TX 78602

Southside Market Headquarters
New Construction, Infrastructure - 5,000 SF
Design
$1,000,000 CJ est. value
Elgin, TX 78621

The Colony MUD 1C Section 2 Rosewood Path Extension
Infrastructure
Bidding
$547,869 CJ est. value
Bastrop, TX 78602

Asphalt Cold Mix D Asppm Grade 4 High Performance Asphalt to Include Delivery
Infrastructure
Post-Bid
Elgin, TX

Hot and Cold Mix
Term Contract
Results
Bastrop, TX

Last Updated 10/04/2022 03:03 PM
Project Title

Construction of the Colony M.U.D. 1C, Section 8

Physical Address View project details and contacts
City, State (County) Bastrop, TX 78602   (Bastrop County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status All Bids Received, Results Expected, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $880,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Any Proposals received after the closing time will be unopened. Any requests received after said time and date will not be addressed. The bidder s surety will be forfeited and become the property of the Owner should the bidder fail to enter into a contract and furnish Payment & Performance Bonds acceptable to the Owner within 10 days after award of the contract. No Proposals shall be withdrawn for a period of 90 days after the opening of the bids. The Owner reserves the right to reject any or all Bids and to waive all defects and irregularities in bidding. The Successful Bidder, if any, will be the responsible Bidder which in the Owner s judgment will be most advantageous to the District and result in the best and most economical completion of the Project.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents