Similar Projects
San Souci Road Elevation Design
Infrastructure
Design
WA

CRT5 Repair Construction
Alteration
Design
$1,000,000 est. value
WA

Hazen High School Parking Upgrades Phase 2
Infrastructure
Bidding
$1,195,992 est. value
Renton, WA 98059

SR 99, Duwamish River to S Spokane St Vic Paving and ADA Compliance
Infrastructure
Bidding
$2,000,000 to $3,000,000 est. value
Tukwila, WA 98178

Transit Facility Improvements Work Order
Infrastructure
Post-Bid
WA

150Th Ave Se / Se 38Th St To Eastgate Way - Roadway Improvements
Infrastructure
Post-Bid
Bellevue, WA

Construction of the 34th Avenue S, South 166th Street to South 160th Street
Infrastructure
Results
$6,250,000 to $7,250,000 est. value
Sea-Tac, SeaTac, WA 98188

SR 516 - Jenkins Creek to 185th Pl SE
Infrastructure
Results
Covington, WA 98042

Brickyard to SR 527 Improvements
Term Contract
Design
Bothell, WA 98011

Park Street Turn Lanes
Infrastructure
Bidding
$45,000 to $55,000 est. value
North Bend, WA 98045

West Valley Highway (Strander Boulevard to I-405)
Infrastructure
Post-Bid
$3,400,000 to $4,000,000 est. value
Tukwila, WA

124th Avenue NE- NE 12th Street to NE Spring Boulevard
Infrastructure
Results
$8,221,853 est. value
Bellevue, WA 98007

Horizon Elementary School Driveway Improvements
Infrastructure
Bidding
$300,000 est. value
Kent, WA 98042

UST Inspect Maintain and Repair
Alteration
Post-Bid
$1,000,000 est. value
WA

I-90, SR18 I/C to Deep Creek - Interchange Improvements and Widening Project
Infrastructure
Results
WA

Reported 05/06/2022 12:00 AM
Project Title

218th Avenue South East Roadway Preservation

Physical Address View project details and contacts
City, State (County) Redmond, WA 98074   (King County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $4,008,770 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project provides for the improvement of 218th Avenue SE from SE Green Valley Road to SE Auburn-Black Diamond Road in King County by clearing and grubbing, roadway excavation, erosion/water pollution control, grading, drainage, surfacing, paving with HMA, guardrail installation, pavement markings, project temporary traffic control, and other work.

Details

Division 00 - Procurement and Contracting Requirements, Available Project Information, Geotechnical Data, Exploratory Excavation Information.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Roadway Construction, Vehicle Barriers, Vehicle Guide Rails.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents