Similar Projects
American Academy of Innovation Charter School
Addition - 3,285 SF
Post-Bid
South Jordan, UT 84095

Alpine School District Central Elementary School Rebuild
Renovation - 70,000 SF
Post-Bid
Less than $15,000,000 est. value
Pleasant Grove, UT

Construction Services for Modifications, Additions and Repairs to Various School District Facilities
Term Contract
Results
$50,000 to $700,000 est. value
North Logan, UT

Construction Management and General Contractor Services
Results
Kamas, UT

Edison Elementary School, Phase-2
Construction
Salt Lake City, UT

Alta High School
Construction
Sandy, UT

Alpine School District Cascade Elementary School Rebuild
Renovation - 70,000 SF
Post-Bid
Less than $15,000,000 est. value
Orem, UT

Roy Junior High School Replacement - CM/GC
New Construction - 165,000 SF
Results
Less than $35,000,000 est. value
Roy, UT

Hillcrest Elementary Replacement
Construction
Logan, UT

DaVinci Playground
Renovation - 29,934 SF
Post-Bid
Ogden, UT 84401

General Contractors Pre-Qualification
Results
Less than $600,000 est. value
Sandy, UT

New Gym Addition Improvements for Rocky Mountain Middle School
Construction
Heber City, UT

Early Light Academy Design-Build Construction Services
Addition - 8,000 SF
Post-Bid
Less than $1,500,000 est. value
South Jordan, UT

High School Music and Spring City Classroom Addition
Addition
Results
Mount Pleasant, UT 84647

DFCM Construction-Utah Schools for the Deaf and the Blind-New Springville School
Construction
Less than $10,500,000 est. value
Springville, UT 84663

Reported 08/22/2019 10:12 AM
Project Title

CCSD Administration Building Remodel

Physical Address View project details and contacts
City, State (County) North Logan, UT   (Cache County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method
Project Status Construction Complete as of 2019
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Tenant Improvement/ Remodel to an existing office building. The tenant Improvement will include removing existing walls/doors and installing new walls/doors. This remodel will also include relocating existing electrical outlets, switches and fixtures. There will be minor mechanical alterations to accommodate for new rooms. Painting will need to be addressed in multiple phases to accommodate for the tenant moving into the space prior to completion of the Tenant Improvement.
Details
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents