Similar Projects
1500 South Trail Crosswalk Construction Project
Alteration
Post-Bid
Less than $75,000 est. value
Woods Cross, UT 84010

Station Park North Site Development
New Construction, Alteration
Post-Bid
Farmington, UT 84025

Layton Sidewalk Improvements
Results
Less than $100,000 est. value
Layton, UT 84040

State Archives Warehouse Building C-6 Ramp and Stairs Replacement
Results
Less than $77,410 est. value
Clearfield, UT

Overland Drive Sidewalk
Infrastructure
Post-Bid
North Salt Lake, UT 84054

DFCM Construction - VBS Design/Build - WSU Noorda A2 Lot & Paid Parking Lot
Results
Less than $3,308,642 est. value

500 West 2000 South to D Street Extension, Clearfield
Infrastructure
Post-Bid
$1,500,000 to $3,000,000 est. value
UT

2021 Replacement and New Construction of Sidewalk
Results
$705,064 est. value
Bountiful, UT

Redwood Road Sidewalk at 1100 North
Results
North Salt Lake, UT 84054

Bonneville Shoreline Design and Construction
Results
UT

New Neighborhood Park
Results
Less than $1,400,000 est. value
Layton, UT 84041

Layton City New Neighborhood Park
Addition
Results
$1,400,000 est. value
Layton, UT 84041

Orchard Drive Sidewalk at 3800 South
Results
North Salt Lake, UT 84054

Park Lane and 326 West Sidewalk - Farmington Pedestrian/Bike Facility
Results
$500,000 est. value
UT

Removal and Construction of Concrete Sidewalk Curb and Gutter at Multiple Locations
Infrastructure
Results
West Bountiful, UT

Reported 02/25/2022 12:00 AM
Project Title

380 King Street Improvements

Physical Address View project details and contacts
City, State (County) Layton, UT 84041   (Davis County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $80,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the installation of sidewalk, curb and gutter, asphalt and all incidental work associated with this sidewalk installation.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents